
3 Calibration
54
Model N6705 Service Guide
Step 5. Select the second voltage calibration point.
Front Panel:
SCPI Command:
The second calibration point is automatically
selected. “Enter P2 measured data” should
be displayed.
CAL:LEV P2
*OPC?
Step 6. Measure the output voltage with the DMM and enter the data.
Front Panel:
SCPI Command:
Enter the value from the external DMM into
the data field and then select Next. When
calibration is complete, select Close.
CAL:DATA <data>
Low Range Voltage Programming
Step 1. Select the low-voltage programming range. The value entered must be
the maximum voltage of the range to be calibrated. This example selects
the 5 V range of output 1.
Front Panel:
SCPI Command:
From the Calibration menu, select Voltage,
Low Range Programming. Then select Start.
CAL:VOLT 5
, (@1)
Step 2. Select the first voltage calibration point.
Front Panel:
SCPI Command:
The first calibration point is automatically
selected. “Enter P1 measured data” should be
displayed.
CAL:LEV P1
*OPC?
Step 3. Measure the output voltage with the DMM and enter the data. This value
may be positive or negative.
Front Panel:
SCPI Command:
Enter the value from the external DMM into
the data field and then select Next.
CAL:DATA <data>
Step 4. Select the second voltage calibration point.
Front Panel:
SCPI Command:
The second calibration point is automatically
selected. “Enter P2 measured data” should
be displayed.
CAL:LEV P2
*OPC?
Summary of Contents for N6705
Page 1: ...Service Guide Keysight N6705 DC Power Analyzer ...
Page 8: ......
Page 104: ......
Page 116: ......
Page 121: ...Replaceable Parts 6 Model N6705 Service Guide 121 Figure 6 2 Top Cover Removed ...
Page 122: ...6 Replaceable Parts 122 Model N6705 Service Guide Figure 6 3 Top Chassis Removed ...
Page 124: ......
Page 132: ......