6 Verify Operation
6. 2 S9106AC-4UP: Detailed Steps to Verify Operation
1.
Connect AC Power Cords & Power On Equipment
2.
Verify X-Apps Controls S9106AC-4UP RF Ports at 3 GHz
6. 2. 1 Connect AC Power Cords & Power On Equipment
3. Connect an AC Power Cord to the S9106AC Base System right-rear panel.
4. Power on the S9106AC-4UP AC Power Switch, located on the left-front panel.
The M9037A PXIe Embedded Controller and the M9300A PXIe Reference are
part of the S9106AC Base System; they both power on and initialize
automatically when the S9106AC Base System is powered on.
After connecting AC power cords and powering on equipment, the
following process must be repeated for each M9410A PXIe VXT
Vector Transceiver and its selected X-Apps software pair in the
system; the S9106AC-4UP 5G FR1 Multi-port Transceiver
contains four M9410A PXIe VXTs that are labelled on the
Rugged Front Panel as Transceiver 1, Transceiver 2,
Transceiver 3, and Transceiver 4.
62
S9106AC-2IF, -4UP, and -42D 5G FR1 Multi-port Transceiver Solutions, Startup Guide
Summary of Contents for S9106AC-2IF
Page 6: ...2 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Page 24: ...20 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Page 42: ...38 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...
Page 56: ...52 S9106AC 2IF 4UP and 42D 5G FR1 Multi port Transceiver Solutions Startup Guide ...