Installation Note N5225-90105
13
Step 8. Install the New Cables
CAUTION
Follow instructions carefully when making cable connections, especially wire harness
connections. Incorrect connections can destroy components, resulting in additional customer
costs.
Install the Semirigid Cables
To see an image showing the location of these cables, click the Chapter 6 bookmarks “Bottom RF Cables, 4-
Port Configuration, Option 401” in the PDF Service Guide
1
. New parts are listed in
.
Install the following new cables in the order listed.
• W40 (N5245-20042) Port 2 RCVR B IN to A27 mixer brick (B)
* As shown in
, install one cable clamp (part number 1400-1334) to secure W40 (part
number N5245-20042).
1. See
Summary of Contents for N5224AU-401
Page 2: ......