Step 4 - Verify Operation
Step 4 - Verify Operation
In this step, the operation of the AWG is verified. Before running a Self Test assure
that all required software is installed, the chassis is powered on, and all cabling is
correct.
The first step is to check the communications and LED Status of the AWG.
Communications
You need Keysight Connection Expert (installed with IO Libraries Suite) to check the
communications of the AWG.
To check if the AWG is visible in the Keysight Connection Expert,
– Start Keysight Connection Expert by clicking Start > All Programs > Keysight
Connection Expert > Keysight Connection Expert.
– If the AWG is still not visible after the Keysight Connection Expert has been
started, click Rescan.
If you are still unable to communicate with the AWG, verify that the following
software and hardware has been correctly installed:
– Keysight IO Libraries Suite
– AWG SFP
– Module and chassis drivers
– System Interface Card, cable and PC PXIe card connections (in case of M9336A
AWG), if you are using an external host PC
AWG Startup Guide
36
Summary of Contents for M9336A
Page 1: ...Startup Guide Keysight Modular Arbitrary Waveform Generator...
Page 6: ...6 This page has been intentionally left blank...
Page 9: ...9 This page has been intentionally left blank...
Page 15: ...This page has been intentionally left blank...
Page 19: ...This page has been intentionally left blank...
Page 21: ...This page has been intentionally left blank...
Page 25: ...This page has been intentionally left blank...
Page 35: ...This page has been intentionally left blank...
Page 37: ...Step 4 Verify Operation 37 AWG Startup Guide Keysight Connection Expert for P9336A AWG...
Page 45: ...This page has been intentionally left blank...