background image

Open Shutters for Board Access

i7090 System Installation

11

Open Shutters for Board Access

For board access along the main conveyor, loosen the hex screws to adjust the two 

shutters on each side of the system.

If the optional bypass conveyor is installed, remove the hex screws to remove the 

shutters on both sides of the system for board access along the bypass conveyor.

Shutter for bypass conveyor

Shutters for main conveyor

Summary of Contents for i7090

Page 1: ...Keysight i7090 Board Test System System Installation...

Page 2: ...ame terms by which the software is customarily provided to the public Accordingly Keysight provides the Software to U S government customers under its standard commercial license which is embodied in...

Page 3: ...ht 7 Connect Air Supply and SMEMA Cables 9 Connect to Network 10 Open Shutters for Board Access 11 Adjust Conveyor Height and Alignment 12 Power Up the System 13 This guide describes the installation...

Page 4: ...operate the equipment until it has been properly earthed by a qualified electrician Overcurrent protection must be provided for this equipment See the installation instructions for overcurrent recomm...

Page 5: ...pleted 2 Check the system and the contents of all crates and boxes against the order and any packing lists Install Monitor Mouse and Keyboard Install the monitor arm and monitor following the manufact...

Page 6: ...ress Safety Brackets Release Press Safety Brackets 1 Open the top front door 2 Unlock the yellow press safety bracket by turning it backwards to release it from the latch Do the same on the other side...

Page 7: ...on 7 Install Tower Light 1 Tighten the nut on the tower light bracket using the adjustable wrench 2 Remove the screws securing the front top panel and remove the panel 3 Remove the two screws for the...

Page 8: ...8 i7090 System Installation Install Tower Light 4 Secure the tower light using the two screws 5 Connect the tower light and system connectors 6 Replace the front top panel...

Page 9: ...Installation 9 Connect Air Supply and SMEMA Cables 1 Remove the bottom rear panel 2 Connect the compressed air supply 3 Use 5 wire SMEMA connections to the upstream and downstream systems Main air su...

Page 10: ...10 i7090 System Installation Connect to Network Connect to Network If the system will be connected to a network connect the LAN cable The LAN port is near the SMEMA Out...

Page 11: ...g the main conveyor loosen the hex screws to adjust the two shutters on each side of the system If the optional bypass conveyor is installed remove the hex screws to remove the shutters on both sides...

Page 12: ...ystems Use boards as a visual aid to checking the alignment 1 Place a board on each conveyor 2 Adjust the position of the machines until the angular misalignment and offset are minimized 3 Adjust the...

Page 13: ...r On Off switch at the rear of the system 3 Switch ON the air pressure valve to start the air supply to the system Adjust the air regulator knob until the pressure gauge on the control panel shows a r...

Page 14: ...This information is subject to change without notice 2021 Keysight Technologies Edition 1 January 2021 www keysight com Q3000 96001...

Reviews: