background image

associated with local AC mains connections.

Assume all measurement, control, and data

I/O connections are for connection to

Category I sources unless otherwise marked

or described in the user documentation.

Exercise extreme caution when a shock

hazard is present. Lethal voltage may be

present on cable connector jacks or test

fixtures. The American National Standards

Institute (ANSI) states that a shock hazard

exists when voltage levels greater than 30V

RMS, 42.4V peak, or 60VDC are present. A

good safety practice is to expect that

hazardous voltage is present in any unknown

circuit before measuring.

Operators of this product must be protected

from electric shock at all times. The

responsible body must ensure that operators

are prevented access and/or insulated from

every connection point. In some cases,

connections must be exposed to potential

human contact. Product operators in these

circumstances must be trained to protect

themselves from the risk of electric shock. If

the circuit is capable of operating at or

above 1000V, no conductive part of the

circuit may be exposed.

Do not connect switching cards directly to

unlimited power circuits. They are intended

to be used with impedance-limited sources.

NEVER connect switching cards directly to

AC mains. When connecting sources to

switching cards, install protective devices to

limit fault current and voltage to the card.

Before operating an instrument, ensure that

the line cord is connected to a properly-

grounded power receptacle. Inspect the

connecting cables, test leads, and jumpers

for possible wear, cracks, or breaks before

each use.

When installing equipment where access to

the main power cord is restricted, such as

rack mounting, a separate main input power

disconnect device must be provided in close

proximity to the equipment and within easy

reach of the operator.

For maximum safety, do not touch the

product, test cables, or any other

instruments while power is applied to the

circuit under test. ALWAYS remove power

from the entire test system and discharge

any capacitors before: connecting or discon-

necting cables or jumpers, installing or

removing switching cards, or making internal

changes, such as installing or removing

jumpers.

Do not touch any object that could provide a

current path to the common side of the

circuit under test or power line (earth)

ground. Always make measurements with dry

hands while standing on a dry, insulated

surface capable of withstanding the voltage

being measured.

The instrument and accessories must be

used in accordance with its specifications

and operating instructions, or the safety of

the equipment may be impaired.

Do not exceed the maximum signal levels of

the instruments and accessories, as defined

in the specifications and operating

information, and as shown on the instrument

or test fixture panels, or switching card.

When fuses are used in a product, replace

with the same type and rating for continued

protection against fire hazard.

Chassis connections must only be used as

shield connections for measuring circuits,

NOT as safety earth ground connections.

If you are using a test fixture, keep the lid

closed while power is applied to the device

under test. Safe operation requires the use

of a lid interlock.

Caution and Warning Notices

A CAUTION notice denotes a hazard. It calls

attention to an operating procedure,

practice, or the like that, if not correctly

performed or adhered to, could result in

damage to the product or loss of important

data. Do not proceed beyond a CAUTION

notice until the indicated conditions are fully

understood and met.

A WARNING notice denotes a hazard. It

calls attention to an operating procedure,

practice, or the like that, if not correctly

performed or adhered to, could result in

personal injury or death. Do not proceed

beyond a WARNING notice until the

indicated conditions are fully understood

and met.

Instrumentation and accessories shall not be

connected to humans.

Before performing any maintenance,

disconnect the line cord and all test cables.

To maintain protection from electric shock

and fire, replacement components in mains

circuits – including the power transformer,

test leads, and input jacks – must be

purchased from Agilent. Standard fuses with

applicable national safety approvals may be

used if the rating and type are the same.

Other components that are not safety-

related may be purchased from other

suppliers as long as they are equivalent to

the original component (note that selected

parts should be purchased only through

Agilent to maintain accuracy and

functionality of the product). If you are

unsure about the applicability of a

replacement component, call an Agilent

office for information.

Cleaning Precautions:

To prevent electrical shock, disconnect the

Agilent Technologies instrument from mains

before cleaning. Use a dry cloth or one

slightly dampened with water to clean the

external case parts. Do not attempt to clean

internally. To clean the connectors, use

alcohol in a well-ventilated area. Allow all

residual alcohol moisture to evaporate, and

the fumes to dissipate prior to energizing the

instrument. 

Summary of Contents for Agilent Technologies PXI Express M9202A

Page 1: ...bit Wideband IF Digitizer M9202A Startup Guide NOTICE This document contains references to Agilent Technologies Agilent s former Test and Measurement business has become Keysight Technologies For more...

Page 2: ...or contract clause Use duplication or disclosure of Software is subject to Agilent Technologies standard commercial license terms and non DOD Departments and Agencies of the U S Government will recei...

Page 3: ...the voltage being measured The instrument and accessories must be used in accordance with its specifications and operating instructions or the safety of the equipment may be impaired Do not exceed th...

Page 4: ...nt means caution risk of danger You should refer to the operating instructions located in the user documen tation in all cases where the symbol is marked on the instrument This symbol indicates the ti...

Page 5: ...anel Connectors 13 Front Panel LED 13 Step 5 Verify Operation of the M9202A Module 14 Conducting a Self Test 15 Conduct M9202A Operational check optional 16 Requirements for Verification 16 Required H...

Page 6: ...Documentation Map 6 M9202A PXI Express 12 bit Wideband IF Digitizer Startup Guide...

Page 7: ...elect Technical Support Manuals l Help system for the Soft Front Panel l Help systems for the device drivers IVI C and IVI COM and LabVIEW G l Specifications Data Sheet Follow the Startup Sequence Thi...

Page 8: ...spect for damage After unpacking the module carefully inspect it for any shipping damage Report any damage to the shipping agent immediately as such damage is not covered by the warranty Warranty info...

Page 9: ...instrument or prevent it from moving in the shipping container Styrene pellets can also cause equipment damage by generating static electricity or by lodging in fan motors If any correspondence is req...

Page 10: ...r operation than is required for installation The amount of space listed above is required for installation 2 Note NET Framework Runtime Components are installed by default with Windows Vista Therefor...

Page 11: ...llowing l Agilent IO Library Suite IOLS which includes the Agilent Connection Expert This software must be installed first Version 16 2 or newer of the Agilent IO Libraries Suite is required l Soft Fr...

Page 12: ...e triangle symbol 5 Install the module into the appropriate slot of the chassis by placing the module card edges into the front mod ule guides top and bottom Ensure that the ejector handle is pushed d...

Page 13: ...t This input is AC cou pled and 50 terminated The recommended signal level is 1 V pk pk 4 dBm The clock signal frequency should be half of the desired sampling frequency TRG OUT This MMCX female conne...

Page 14: ...202 module is recognized 3 Select the M9202A module and check that the correct Model Name appears in the Instrument Properties 4 Select the Installed Software tab and review the configuration data as...

Page 15: ...e with the processor controlling it When the SFP is launched it will initiate a self calibration which takes a little over 1 minute Verify that no error is shown in the lower left hand log area The im...

Page 16: ...or 1x BNC MMCX cable 50 Coaxial 100 cm Operational Verification Procedure Do not exceed the maximum power level to the INPUT connector 0 5 W 1 Launch the soft front panel SFP The calibration must succ...

Page 17: ...cilloscope 3 If the problem occurs during Operational Verification disconnect the input signal and note the status of the LED on the front panel it should be GREEN Reconnect the signal and select the...

Page 18: ...ers Manufacturers Group PCIe and PCI EXPRESS are registered trademarks and or service marks of PC SIG Microsoft Windows VisualStudio VisualC VisualC and VisualBasic are either registered trademark or...

Reviews: