Assembly
19
Step 6
Slide Right Pec Dec Arm (8) on to the shaft of the Pec Dec Mount (7). Secure the arm in place using
one Big Washer (76), one Washer (102), one Spring Washer (103), and one Allen Bolt (97).
Slide Pec Dec Handlebar (19) onto the top of the Right Pec Dec Arm (8) and secure using one Chrome
Washer (106), one Washer (102), one Spring Washer (103), and one Allen Bolt (97).
Repeat this step to complete the Left Pec Dec assembly.
Figure 6
Summary of Contents for 2250
Page 5: ...Assembly 5 Box 1 ...
Page 6: ...Assembly 6 Box 2 ...
Page 7: ...Assembly 7 Box 3 ...
Page 8: ...Assembly 8 Box 4 ...
Page 9: ...Assembly 9 Box 5 ...
Page 10: ...Assembly 10 Box 6 Box 7 Box 9 Box 11 Box 8 Box 10 ...
Page 11: ...Assembly 11 ...
Page 12: ...Assembly 12 ...
Page 13: ...Assembly 13 ...
Page 34: ...Assembly 34 Congratulations You have completed the assembly of your new KPS 2250 ...
Page 37: ...Cable View 37 ...
Page 38: ...Cable View 38 ...
Page 39: ...L 86 6 W 86 6 H 83 5 Top View 39 ...
Page 40: ...Exploded View 40 ...
Page 41: ...Exploded View 41 ...