Assembly
29
Step 16
Note:
Stretch all cables out completely and make sure all twisting is removed before installing.
Install Pec Dec Cable (49) as detailed in Figure 16. Follow dotted lines to identify exact location of pulleys.
See Page 37 “Cable View” for more detail.
You will need the following for installation:
Cable (49) - Qty. 1
Pulley (44) - Qty. 3
Pulley Bracket Block (22) - Qty. 1
Bolt (91) - Qty. 3
Washers (102) - Qty. 6
Nylon Lock Nut (104) - Qty. 3
Philip Screw (85) - Qty. 2
Figure 16
Summary of Contents for 2250
Page 5: ...Assembly 5 Box 1 ...
Page 6: ...Assembly 6 Box 2 ...
Page 7: ...Assembly 7 Box 3 ...
Page 8: ...Assembly 8 Box 4 ...
Page 9: ...Assembly 9 Box 5 ...
Page 10: ...Assembly 10 Box 6 Box 7 Box 9 Box 11 Box 8 Box 10 ...
Page 11: ...Assembly 11 ...
Page 12: ...Assembly 12 ...
Page 13: ...Assembly 13 ...
Page 34: ...Assembly 34 Congratulations You have completed the assembly of your new KPS 2250 ...
Page 37: ...Cable View 37 ...
Page 38: ...Cable View 38 ...
Page 39: ...L 86 6 W 86 6 H 83 5 Top View 39 ...
Page 40: ...Exploded View 40 ...
Page 41: ...Exploded View 41 ...