521 East 3
rd
Street Mt. Vernon, NY 10553 • www.keydigital.com
Rev 1.2
– March. 2021
32
INSTALLATION IN GANG BOX
1. Ensure the keypad is programmed and all 8 buttons are placed on the keypad.
2. Connect network cable from PoE network switch or PoE injector into KD-WP8 LAN (POE) port.
3. Insert KD-WP8 into the gang box, ensure it is right-side-
up by confirming with the wording “TOP” printed
on keypad. Then, fasten by using the long mounting screws.
4. Place the decora plate into position and fasten using the short decora screws.
5. Test the buttons by pressing a few times each, ensuring that they pop back into position and are not
obstructed by the decora plate.