6. Operation
The chapter "Safety instructions" must be heeded.
6.1 Setting up for operation
Before the separator is put into operation, please make sure
that:
• the separator is clean and the interior is free from any ob-
jects which may have been placed inside during shipping
or installation.
• the separator is completely filled with clean cold water.
Completely filling the separator is complete when water
begins to drain from the outlet.
6.2 Initial Instructions
Placing the separator into full operation is normally handled
by a licensed tradesman although upon request can be hand-
led by a KESSEL representative.
The following personnel should be on hand when the initial
instructions for placing the separator into operation are given:
• Building facilities manager
• Building maintenance workers
• Contracted plumber / tradesman
• Contracted disposal company
What to do:
• Check to make sure the separator is completely water-
tight. Check to make sure that during transport and instal-
lation that no damage to the separator was caused. Check
to make sure all connections to the separator (inlet, outlet,
refill, rinse pipes etc.) are in perfect working order.
• Representative should discuss all necessary information
regarding the disposal.
• Representative should take the customer step by step
through all stages of a separator disposal.
• After the separator has been emptied (disposed) all ne-
cessary paperwork and documentation should be handed
over to the customer.
• The separator should be returned to service by filling the
separator with fresh, cold water.
6.4 Hand-over of installation and user’s manual.
6.5 Completion of the commissioning report.
After commissioning has been completed the separator
should be placed into normal operation mode.