Evo Heat Pump Manual Version 5
Page 24 of 84
i.
Position the appliance on a firm, level and substantial concrete base that will absorb vibration and
ensure the unit is well away from any occupied rooms.
ii.
Using the adjustable feet, level the unit and tighten the M10 locking nuts on the feet when level.
iii.
Ensure the heating distribution system has been thoroughly purged of any debris.
iv.
Connect the ground feed & return pipes from the Slinky manifold as per the illustration below. Suit
able connections include
‘
Speedfit
’
or compression fittings. Do not use any
‘
Hot
’
work methods.
v.
The Evo can accept pipes from the left, right or top. If the pipe direction is from the top remove the
rear top panel to allow access for the pipes. Remember to allow enough space to allow the
electrical cables access into the Evo.
Figure 16 Top panels
Rear Top panel
Top Panel
Safet
y
in
fo
rmatio
n
G
en
e
ral
p
ro
d
u
ct
in
fo
rmatio
n
In
stal
lati
o
n
Me
ch
an
ic
al
in
stal
lati
o
n
Ele
ctr
ic
al
in
stal
lati
o
n
Me
ch
an
ic
al s
et
to
ru
n
Co
n
tr
o
lle
r
Fau
lt
Fin
d
in
g
W
arr
an
ty
H
eat P
u
mp
se
ttin
gs
s
h
ee
t
In
tr
o
d
u
cti
o
n