Mounting the Control Box
CAUTION:
Install the Control Box in a well ventilated place protected against rain and sunlight.
NOTE: It is strongly suggested that the control box should be mounted in the side of Master Gate
(Gate 1), so that the electric lock can be installed correctly and work properly (See Page 9).
Step 3
Insert the cable of the second gate opener and alarm lamp cables into the control box through middle strain
relief. Then repeat step 2.
Step 4
Insert other cables into the control box through rightmost strain relief. Then repeat step 2.
Step 1
To install the control box use the deck screws (not provided).
Ensure the control box is installed in a secure surface and at least
100 cm (40 inches) above the ground to protect it from rain, snow,
etc. which probably cause damage to the control box.
Warning:
Before connecting the AC power cable to the
control box, check the plug of power cable is disconnected from AC
power socket.
Step 2
Insert the power cable and cable of the first gate opener through the front
strain relief and into the control box by loosening the strain relief screw
located in the leftmost of outside bottom of the control box and feeding the
cables into the control box. Check the length of cables is long enough to
their respective terminal block in control box.
Retighten the sealing nut so that cables are well locked.
Summary of Contents for KNL502+
Page 1: ......
Page 4: ...2 Parts List...
Page 9: ...7...
Page 10: ...8 Step 5 Install the Opener s Base Plate Step 6 Install the Gate Bracket...
Page 15: ...13 Connecting of the control board For Pull to Open...
Page 25: ...23 Quick Setting Guide...
Page 26: ...24...
Page 27: ...25...
Page 28: ...26...
Page 29: ...27...