
SuperSnake GTX
Operating manual - EN
2.3 Connecting subfeeder
The welding cable with Euro connector transfers welding power, shielding gas and filler wire. The separate control cable
connection is used for additional welding controls (e.g. remote control).
All of the subfeeder cables should be connected before installing the subfeeder into the protective frame. Refer to
"Installing subfeeder into protective frame" on page 18.
If voltage sensing cable and/or water cooling is used, the subfeeder must be turned upside down for correct cable
routing and connections.
1.
Connect the subfeeder interconnection cable (welding cable, control cable and synchronization cable) to the sub-
feeder. Secure the cables by hand tightening the collars.
2.
Connect the welding gun to the subfeeder. Secure the welding cable by hand tightening the collar.
To ensure reliable welding performance, please ensure the gun is suitable for the intended welding application and is
in good working order, correctly fitted with suitable wire liner components and contact tip as well as with the water
cooling hoses.
© Kemppi
15
1921930 / 2144