background image

INSTALLATION INSTRUCTIONS

MINIMUM HEIGHT OF FLUE SYSTEM EXIT

INSTALLATION TO COMPLY WITH AS/NZS 2918

20/08/2020

ver. 29

14

3000 

OR LESS

INCREASE FROM 1000 MIN 
UNTIL CLEAR WITHIN 3000 OF 
TOP OF FLUE

3000

ANY NEARBY 
STRUCTURE

6000

MORE THAN 

3000

600 

MIN

3000

1000 MIN IF CLEAR WITHIN 
3000 OF TOP OF FLUE

INCREASE AS NECESSARY UNTIL
NOTHING WITHIN 6000 OF THE FLUE
TOP

600 

MIN

3000 

OR LESS

MORE THAN 

3000

DIMENSIONS IN MILLIMETRES

Summary of Contents for CELESTIAL 900

Page 1: ...ION 10 YEAR FIREBOX WARRANTY The firebox is covered by a 10 year warranty Other parts are covered by a one year limited warranty Head Office 13 French Avenue Brendale Queensland 4500 Telephone PH 07 3490 5500 Facsimile FAX 07 3490 5520 Website www jetmaster com au Business hours Monday to Thursday 7 30am 4 00pm Friday 7 30am 2 00pm Email sales jetmaster com au 20 08 2020 ver 29 1 ...

Page 2: ...ITH HEAT DUCTING BOX FOR METAL FRAME AND MASONRY HEBEL B H I D H DIMENSIONS DESC MODEL A B C D E F G H I J K L M CELESTIAL 900 WALL INSERT 468 495 633 653 1054 252 548 202 528 1100 592 776 268 L M 20 08 2020 ver 29 2 J K FASCIA ...

Page 3: ...MENT SHEETING COMBUSTIBLE WALL 513 50 725 REFER TO CLAUSE PAGE 5 FIBRE CEMENT SHEETING STEEL FRAME STEEL FRAME STEEL FRAME STEEL FRAME MINIMUM CLEARANCES FOR THE CELESTIAL 900 SOLID FUEL APPLIANCE INSTALLED WITH METAL FRAMING AND DEFAULT FLUE KIT HEARTH NEEDS TO BE 200mm PAST THE DOOR OPENING LEFT AND RIGHT ...

Page 4: ...box fully welded 25mm thick firebrick lined floor back and sides 19mm ceramic baffle plates NOTE The floor protector consists of a 18mm thick Bellis Board or similar material which has a thermal resistance of 0 1m k W per 9mm thick sheet PERFORMANCE Heating capacity 220 320m2 23 33 squares Average peak heat output 12 7kW Average Particulate emission 0 6g kg Average efficiency 60 Heating capacity o...

Page 5: ... B A A UNIT HEIGHT ABOVE FLOOR 200 300 400 500 600 700 B HEARTH DIMENSION FORWARD OF UNIT 725 715 665 594 492 335 20 08 2020 ver 29 5 UNDERNEATH UNIT AND HEARTH THICKNESS MUST BE A MINIMUM 18mm NON COMBUSTIBLE MATERIAL FC SHEET OR SIMILAR ...

Page 6: ... UNIT X Y NOTE IF Y IS LESS THAN 200mm THEN REFER TO HEARTH MEASUREMENT ON PREVIOUS PAGE X MIN DEPTH MEASUREMENT mm 300 Y MIN HEIGHT INCREASE mm 200 20 08 2020 ver 29 6 UNDERNEATH UNIT AND HEARTH THICKNESS MUST BE A MINIMUM 18mm NON COMBUSTIBLE MATERIAL FC SHEET OR SIMILAR ...

Page 7: ...K 222 4 BAFFLE PLATE SIDE OF 222 MM SHOULD EXTEND FROM SIDE TO SIDE 6 SLIDE THE BAFFLE PLATES ATOP THE OTHER 2 BAFFLE PLATES INTO THE MIDDLE POSITION AS SHOWN LEAVE GAP OF 1 2 MM IN BETWEEN PLATES THE GAPS SHOULD BE ROUGHLY IN THE MIDDLE OF THE AIR TUBES UNIT IS NOW READY FOR USE 5 RE PLACE MIDDLE AIR TUBE BACK INTO POSITION NB MAKE SURE OPEN END OF AIR TUBE IS PLACED INTO REAR OPENING CLOSED END ...

Page 8: ...NTS MUST BE INSTALLED METAL FRAMING ONLY TO BE USED FOR THE CONSTRUCTION 460 MM DEPTH 25 MM CUT OUT CLEARANCE AROUND 10 FLUE CEILING CEILING TRIPLE FLUE KIT 50 MM MIN DISTANCE BETWEEN HEAT DUCTING BOX AND METAL FRAMING TYP HEAT ZONE VENT SUPPLIED NOT TO BE INSTALLED TO AN OUTSIDE WALL INTERNAL ONLY 400MM MIN DISTANCE BETWEEN HEAT DUCTING BOX AND METAL FRAMING LOWEST FIXING POINT 400MM ABOVE HEAT D...

Page 9: ... Hebel Block 25mm min Hebel Block min thickness 75mm 25mm min clearance between 10 flue and framing 6 Flue Inlet air vents into chase Rear timber stud wall combustible wall 25mm min air gap Outlet air vents from chase DETAIL A All 8 10 assembled flues must have the crimps pointing upwards crimped plain All 6 assembled flues must have the crimps pointing downwards crimped plain DETAIL B B A Flue sy...

Page 10: ...m FIBRE CEMENT SHEETING FASCIA FASCIA VILLABOARD HEAT DUCTING BOX 18 MM BELLIS BOARD OR EQUIVALENT FOR WOODEN FLOORS 725 670 DETAIL A A METAL FRAMING OR REFRACTORY 10 8 6 IF COWL IS LESS THAN 3000 MM TO RIDGE LINE COWL TO BE 600 MM ABOVE RIDGE CELESTIAL 900 INFORMATION FOR TYPICAL METAL FRAME A DOOR SIDE VIEW MANTLE CEILING METAL FRAME FIRE BOX REFER HEARTH MEASUREMENT DRAWING IF UNIT IS HIGHER TH...

Page 11: ...INE OR 600 MINIMUM ABOVE RIDGE IF PENETRATION IS 3 METRES OR CLOSER TO RIDGE POP RIVET OR SCREW BRACKETS TO THE OUTSIDE OF THE OUTER CASING SHORT TUBE FROM THE COWL FITS INTO FLUE PIPE ALL FLUES SHOULD BE TRIMMED LEVEL B A DETAIL A 6 FLUE 8 FLUE 10 FLUE FLEXIBLE HOSE FOR HEAT ZONE VENT FRONT VIEW DETAIL c ALL 8 10 ASSEMBLED FLUES MUST HAVE THE CRIMPS POINTING UPWARDS ALL 6 ASSEMBLED FLUES MUST HAV...

Page 12: ...GH GAP FOR THE FASCIA TO SLIDE BETWEEN THE BOX AND THE WASHER 3 BEND THE SILICONE TABS INTO POSITION THIS TAB SHOULD BE PARALLEL TO THE FRONT OF THE FASCIA WHEN IN THE CORRECT POSITION 4 SLIDE FASCIA INTO THE REQUIRED POSITION THEN HAND TIGHTEN THE SCREWS AS REQUIRED OR USE AN APPROPRIATE ALLEN KEY OR PLIERS USE A TOUCH UP PAINT ON THE SCREW HEADS AS REQUIRED 5 RE INSTALL THE DOOR BACK ON USE THE ...

Page 13: ...ME SPOT SO THAT THE DOOR WILL LOCK PROPERLY 3 LOOSEN THE 2 BOLTS AS REQUIRED DO NOT UNSCREW THE BOLTS ALL THE WAY OUT 4 PUSH THE PACKER FROM THE BOTTOM EDGE OF THE ADJUSTMENT ANGLE UNTIL FULLY REMOVED ONLY TAKE OUT WHAT IS NECESSARY RE POSITION THE ADJUSTMENT ANGLE AT THE MARKERS AND TIGHTEN NOTE UP TO 4 PACKERS CAN BE REMOVED IF NECESSARY 5 CLOSE THE DOOR AND CHECK IF THE LATCH LOCKS PROPERLY THE...

Page 14: ...ver 29 14 3000 OR LESS INCREASE FROM 1000 MIN UNTIL CLEAR WITHIN 3000 OF TOP OF FLUE 3000 ANY NEARBY STRUCTURE 6000 MORE THAN 3000 600 MIN 3000 1000 MIN IF CLEAR WITHIN 3000 OF TOP OF FLUE INCREASE AS NECESSARY UNTIL NOTHING WITHIN 6000 OF THE FLUE TOP 600 MIN 3000 OR LESS MORE THAN 3000 DIMENSIONS IN MILLIMETRES ...

Page 15: ...20 08 2020 ver 29 15 ...

Page 16: ...ately 10 to 15 minutes until the new pieces are burning well then it may be returned to its desired setting 6 To set the fire for overnight burn two thirds fill the firebox with hardwood and fully open the air inlet Once the fire is burning well the air inlet control should be shut down approximately three quarters of its travel Setting the air inlet control may be varied to suit your particular r...

Page 17: ...20 08 2020 ver 29 17 ...

Page 18: ...with higher heat production than wet or green wood The difference between the amount of heat produced by dry wood and green wood is so great that a dry softwood of good grade will produce more heat than green hardwood Green white ash for instance is not as good a fuel as dry tamarack The reason for the superiority of dry wood is easy to understand Heat cannot be produced until moisture has been dr...

Page 19: ... of inspection for damaged heater 5 CLAIMS 5 1 I Kemlan will provide a full replacement of the heater in the first five years after installation ii Replacement in the subsequent five years i e sixth to tenth year after installation will be on the following basis Owner will pay fifty percent of the current retail price if the claim is made in the sixth year tenth year after purchase 5 2 Replacement...

Page 20: ...20 08 2020 ver 29 NOTES 20 ...

Page 21: ...20 08 2020 ver 29 21 ...

Page 22: ...20 08 2020 ver 29 22 ...

Reviews: