555518_A
p7.
M3i INDOOR GROUP CYCLE
OPERATION
INSTALLATION
NOTE: Due to the weight of the cycle, it is recommended that two
people perform this part of the assembly.
1. Align the holes of the cycle with the studs of the base,
refer to Figure 1. The front of the cycle should face the
wheels of
the base.
2. Place the cycle onto the base.
3. Insert a washer (supplied) on each of the four studs.
4. Install an acorn nut (supplied) on each stud and then
hand tighten the acorn nuts.
5. Torque the acorn nuts to 45 Nm (35 ft-lbs) using a 16mm
or 5/8” crowfoot attached to a torque wrench.
1. Place the shifter lever in the downward position, refer
to Figure 2.
2. Slide the flywheel between the two magnets,
refer to Figure 3.
MOUNTING THE CYCLE TO THE BASE
INSTALLING THE FLYWHEEL AND HUBCAP
WARNING: Not following these instructions may cause damage to the flywheel.
Figure 1. Cycle and Base Alignment
Figure 3. Location of Magnet
Figure 2. Shifter Lever Position