background image

08

INSTALLATION INSTRUCTIONS

TRIPLE TRAINER

STEP-BY-STEP INSTALLATION GUIDE

1

PREPARE DRILL HOLES FOR ADHESIVE

• 

Clean drill holes with a Wire Tube Brush.

• 

Collect dust/debris using a HEPA Vacuum.

CONCRETE WITH FLOORING ONLY

• 

Fit each 1” (25.4 mm) diameter hole cut with Spacers 

(supplied) to match flooring height. 

NOTE: Multiple Spacers in each hole is OK. 

Example:  3/8”  flooring  height  requires  1/4”  and  1/8” 

Spacers per hole.

ADHESIVE APPLICATION

• 

Set the Floor Mount Plate aligned with the drill holes.

IMPORTANT:

 Installation over Flooring — check Spacers 

do not interfere with Floor Mount Plate seating. If any gaps 

are present, fit the holes with the appropriate size Spacers. 

• 

Follow the Adhesive Manufacturer’s application instructions.

IMPORTANT:

 Adhesive is fast-curing with very short 

working time. The next step (

Step 4) must be performed 

immediately after the Adhesive is applied. 

NOTE: Floor Mount Plate Kit installation procedure shown. Pre-assembled Triple Trainer installation is similar.

DRILL USING THE FLOOR MOUNT PLATE AS THE DRILL PATTERN (QUANTITY 3 DRILL HOLES)

IMPORTANT:

 Check the Floor Mount Plate alignment as each hole is drilled to avoid costly rework.

CONCRETE OR CONCRETE WITH FLOORING UP TO 5/8” (16 mm)

• 

Drill the length of the screw anchor, including overdrill, into the concrete:
4” (102 mm) anchor screw + 1/2” (13 mm) overdrill depth = 4-1/2” (115 mm)

CONCRETE WITH FLOORING OVER 5/8” (16 mm)

 

• 

Flooring over 5/8” (16 mm) thick requires a 3/8” diameter anchor with appropriate length (not supplied). 

• 

Drill the length of the anchor, including overdrill, into the concrete, as specified by the manufacturer.

• 

Cut a 1-inch diameter hole into the flooring material, centered over each drill hole. This is to clear flooring material 

for spacers to be installed later in Step 2. 

Floor Mount

Plate

CONCRETE, 

FLOORING UP TO 

5/8” (16 mm)

CONCRETE 

WITH FLOORING

OVER 5/8” (16 mm)

4” (102 mm)

Drill length 

of Anchor

1/2” (13 mm) 

overdrill

Overdrill per Mfg 

Specification

WEAR SAFETY 

GLASSES

2

3

Collect Dust/Debris

using a HEPA Vacuum

CONCRETE 

WITH FLOORING

Fit Spacers

Clean Drill Holes with Wire Tube Brush

1” (25.4 mm)

dia. hole cut 

in Flooring

3/8” dia.

Summary of Contents for INFINITY 3020XA

Page 1: ...or operation of the Triple Trainer after reading this manual contact Keiser Customer Support 1 559 256 8000 service keiser com keiser com support Telephone and Live Chat Monday Friday 9 am to 5 pm PS...

Page 2: ...LS AND MATERIALS 06_UNPACKING 07_PARTS LIST 08_STEP BY STEP INSTALLATION GUIDE 11_AIR SYSTEM SETUP FINAL INSTALLATION 11 BEFORE YOU USE THE TRIPLE TRAINER This equipment contains electrical or electro...

Page 3: ...ive equipment PPE observe all governing codes and ordinances 12 Safety Glasses required during installation 13 Use a dust collection system when drilling clean area using a HEPA vacuum Avoid breathing...

Page 4: ...Length may vary based on Accessory type user height and the position setting of the exercise Arm To safely and effectively use your Training Space remember to 1 Clear your Training Space Ensure there...

Page 5: ...TION OPTIONS ANCHORING Equipment must be installed with the Floor Mount Plate Use all four anchor holes on the Floor Mount Plate to secure the equipment Follow all safety and installation instructions...

Page 6: ...area has been planned according to the training space required refer to the Training Space section page 4 UNPACKING Figure 3 Unpacking the Triple Trainer Safety Glasses High Quality Floor Wall Scanne...

Page 7: ...8Cx1 8M in 8078 11 3 Male Quick disconnect QD 110897 12 1 Air Tube with Luer and Quick Disconnect 953108 8086 110897 13 12 Washer 3 8 in 9355 14 12 Screw 3 8 16x3 4 in 9200 15 6 Screw 1 4 20x3 8 in 9...

Page 8: ...installation is similar DRILL USING THE FLOOR MOUNT PLATE AS THE DRILL PATTERN QUANTITY 3 DRILL HOLES IMPORTANT Check the Floor Mount Plate alignment as each hole is drilled to avoid costly rework CO...

Page 9: ...Anchor through the Floor Mount Plate and into the drill holes Tighten the Screw Anchors into the concrete until the hex washer head contacts the surface of the Floor Mount Plate Immediately remove an...

Page 10: ...for the remaining two Brackets B A 7 Remove x2 1 4 20x1 4 in Phillips Screws BRACKET INSTALLATION PREPARATION Remove the top two 1 4 20x1 4 inch Phillips Screws along the sides of the Functional Train...

Page 11: ...the Compressor into a power source to power the Compressor ON Allow the Compressor to build up to a minimum of 100 psi 6 89 bar POWER ON THE EQUIPMENT Press the and then the Thumb Buttons a few times...

Page 12: ...uestions regarding the installation or operation of the Triple Trainer after reading this manual contact Keiser Customer Support 305522_B 1 559 256 8000 service keiser com keiser com support Telephone...

Reviews: