![KEHUA TECH iStoragE1 Series User Manual Download Page 42](http://html1.mh-extra.com/html/kehua-tech/istorage1-series/istorage1-series_user-manual_3911453042.webp)
3 Installation
Hybrid Inverter
User Manual
34
Figure3-33 Fasten the metal terminal
Step 4 Tighten the sealing nuts of positive connector and negative connector to the corresponding insulation
crusts respectively, as shown in Figure3-34.
Figure3-34 Tighten the sealing nuts
Step 5 Measure the voltage and check if the positive and negative is connected properly and if the voltage
within the input range of the inverter.
Step 6 Insert the positive connector and negative connector (black) to the PV+ and PV– terminals (as shown
in Figure3-35) and tighten them. If there has a click sound, it means that the connector have been
inserted properly.
Figure3-35 Connect the PV connector
----End