12
G.
Divide the distance recorded in step
E
by 2, mark
this measurement on gate top and bottom tubes as shown. This
measurement is to be removed from both gates to ensure both
gates are the same width and meet in the middle.
J.
To tension the return spring hinge loosen the locking nut as
shown.
I.
Carefully re-position the gate top and bottom tubes into the
cast fittings. Use a spirit level, to ensure the gate is level. Tighten
the cast fittings grub screws using a hex head socket. Using the
torque wrench ensure the castings are torqued to 39Nm.
H.
Using a hacksaw or similar carefully cut through the top and
bottom tubes as shown. For galvanized assemblies, spray with
Galvafoid or similar to prevent corrosion.
F.
Disconnect the tubular gate from the hinge assembly by
loosening the top & bottom cast clamp grub screw, using a hex
head socket as shown.
K.
Manually open the gate at 45 degrees from its closed
position.
Mounting double gates and tensioning spring