background image

PRECONDITIONS

BUILDING NOTICE

Building notice may be required for the installation of 

a fireplace insert. Contact the Planning and Building 

Committee in your municipality for up-to-date infor-

mation.

FLUE

Keddy's fireplace inserts may be connected to a flue 

approved for a minimum of 350°C. The fireplace 

inserts are also approved for connection to older 

masonry chimneys with enclosing walls that are only 

half a brick thick. Naturally, fireplace inserts can also 

be connected to chimneys made of prefabricated ele-

ments, e.g. the Heda Chimney.

If you want to connect your insert to an existing chim

-

ney, you must ensure the duct is smoke-tight before 

installation. Contact your local chimney sweep or 

specialist before beginning installation.

For the installation to function satisfactorily, the nega

-

tive pressure (draught) must be at least 12 pa during 

nominal operation. To achieve this, the chimney 

should be at least 3.5 m tall and have an area of ap-

prox. 120 cm2.

COMBUSTION AIR SUPPLY

For the combustion of wood air/supply air is required. 

Fireplace inserts can be supplied with outdoor supply 

air via an outdoor air unit. (Accessory) The aim of 

bringing outdoor air to the combustion is to counter

-

act the negative pressure that can occur in houses 

with mechanical ventilation. This is not normally 

necessary for a fireplace insert as it is installed in an 

existing open fireplace, which is designed to work in 

the house atmosphere.

A sheet metal drum can be used to extend an out-

door air duct. The connection diameter of the supply 

air hose to the stove is 63 mm. If the duct is more 

than 1 m long, the diameter of the sheet metal drum 

must be increased to 100 mm. The drum can be con-

nected from below or from the rear, see illustration. 

(The insert's maximum need for combustion air is 

approx. 15 m3/h)

Do not take the supply air from crawl spaces. If there 

is a crawl space, the sheet metal drum must be ex

-

tended to a valve in the foundation wall. If the space 

is heated, the supply air channel must be insulated 

against condensation. 

STANDARD DELIVERY

Check that all parts for your installation are included 

in the delivery.

Insert

Box inside insert containing:
1 x Combustion air pipe (45 degrees)

1 x Vermiculite kit (6 sheets)

1 x Heat resistant sealant

1 x Glove

1 x log stopper

ACCESSORIES

Installation kit (Support leg, Pipe including top 

sleeve, pressure ring, insulation)

Angled combustion air pipe (for installation straight 

up or stright back)

Outdoor air kit (Outdoor air unit, 1 m hose, conden

-

sation insulation, façade grating

Steel pipe, dim. 125 mm

Cast iron hot air grill

Frame for wallconnection

Guard (grated steel) (Needs frame for mounting) 

Stand

Reflection plate

  

- 4 -

Summary of Contents for SK1000

Page 1: ...Fireplace inserts Installation instructions Care and firing instructions Model SK1000 SK2000...

Page 2: ...MATION 3 IMPORTANT POINTS 3 PRECONDITIONS 4 Building notice Flue Combustion air Standard delivery Exploded diagram PREPARATIONS 5 INSTALLATION INSTRUCTIONS 6 8 CARE FIRING INSTRUCTIONS 9 10 TECHNICAL...

Page 3: ...been manufactured in accordance with the documents that form the basis for the respective certificates and their associated requirements for production inspections IMPORTANT POINTS Contact the Plannin...

Page 4: ...occur in houses with mechanical ventilation This is not normally necessary for a fireplace insert as it is installed in an existing open fireplace which is designed to work in the house atmosphere A...

Page 5: ...l installations of Keddy s fire place inserts with this parameter fulfilled Since existing open fireplaces vary in design this should be considered as an installation guide and we will discuss two ins...

Page 6: ...sory adjust the support leg to 90 degrees and screw it in alignment with the underside of the pipes Move the protection rod from the 45 degree smoke outlet to the 90 degree smoke outlet 3 Use the supp...

Page 7: ...e protective iron rod and pull it into position enabling you to fit the two screws Once again check that the insert is level 6 If nessesary assemble the front door to the insert body Be very careful t...

Page 8: ...you want to insulate it against the existing chimney with mineral wool Ensure that the insulation seals tightly against the existing chimney and that it is level with the upper edge of the pipe so no...

Page 9: ...RE FIRING WHEN THE FIREPLACE IN SERT IS NEW During the first week firing can be started carefully Begin with one or two fires a day with half of the fol lowing prescribed amount of wood A particular s...

Page 10: ...te the downdraught and avoid the nuisance of smoke enter ing the room in the initial stage If the premises are equipped with mechanical venti lation i e if there are one or more fans to evacuate the a...

Page 11: ...00 Height 470 475 mm Width 500 mm Depth 400 mm Weight 100 kg Flue pipe diameter 125 mm Efficency 82 Output 4 9 kw SK2000 Height 535 540 mm Width 600 mm Depth 500 mm Weight 125 kg Flue pipe diameter 12...

Page 12: ...www keddy se Keddy AB Box 542 441 15 ALINGS S Tel 46 0 322 781 80 Fax 46 0 322 781 89 E mail info keddy se Website www keddy se Rev 1 01 09 2013...

Reviews: