WARNING!
Risk of electric shock and fire hazard!
●
Installation, commissioning, maintenance or retrofitting of the device
must be performed by correctly trained, qualified and authorized electri-
cians
1)
who are fully responsible for the compliance with existing stan-
dards and installation regulations.
Please observe that national regulations may be required.
●
Do not install or use a damaged device.
●
A damaged device must be taken out of commission and repaired or re-
placed by a qualified and authorized electrician.
●
Repair of the device is not permitted and may only be carried out by the
manufacturer.
●
No unauthorized conversion work or modifications may be made.
●
No markings (such as safety signs, warnings, wire markings, etc.) may
be removed.
●
Use the device only in a dry environment and keep it away from liquids.
●
Only install the device in permitted housings or electrical distribution
boards downstream of the PSC meter so that the connections for the
phase conductor and neutral conductor are located behind a cover or
contact protection.
●
Comply with prescribed minimum spatial clearances between the net-
work cable and live installation components or use suitable insulation.
●
To restrict access to authorized personnel, the housing or electrical dis-
tribution board may only be accessible by means of a key or tool.
●
Before installation or maintenance work, de-energize the electrical distri-
bution board and secure it from accidentally being switched on again.
●
It must be possible for the end user to de-energize the device by means
of a freely accessible fuse or and additional circuit breaker.
●
The voltage inputs of the device must be protected with fuses (16 A
Type B).
●
De-energize the device before cleaning it, and only clean it using a dry
cloth.
1)
Persons who, due to their special training, expertise and experience as
well as knowledge of current standards, are able to assess the work per-
formed and the possible hazards.
Summary of Contents for KeContact E10
Page 1: ...KeContact E10 Energy meter Installation manual V 1 00 Original instructions...
Page 30: ...E10 Declaration of conformity V1 00 30 KEBA 2023 15 Declaration of conformity...
Page 31: ...E10 Declaration of conformity V1 00 31 KEBA 2023...
Page 33: ......
Page 34: ...KEBA Energy Automation GmbH Reindlstra e 51 4040 Linz Austria www keba com...