A s s e m b l y I n s t r u c t i o n s
|
KBL Tower pureEnergy 5.0
10
4. Assembly
4.1 Tools and aids
Folding ladder
Spirit level
4
Hexagon socket spanner SW 4
6
Hexagon socket spanner SW 6
22
1x Spanner SW 22
19
1x Spanner SW 19
17
1x Spanner SW 17
13
2x Spanner SW 13
8
2x Spanner SW 8
Number of required persons
The sections that follow describe the process steps
required to install a tanning device without central
exhaust air module.
For tanning devices with central exhaust air mod-
ule, also refer to the section at the end of these
instructions!
At the beginning of each chapter, the required tools
and aids are depicted, unless the corresponding
process can be carried out by one individual person
without any further auxiliary equipment.
The disassembly is basically carried out in reverse
order of the assembly.
4.2 Setting up the back wall
19
22
Set up the back wall and use the height-adjustable
feet to level it.
19
22
70
Distance from the top of the lower con-
necting plate to the floor -> approxi-
mately 70 mm (≈2,756 inches).
Summary of Contents for megaSun pureEnergy 5.0
Page 1: ...TANNING DEVICE TANNING DEVICE ASSEMBLY INSTRUCTIONS MENU SETTINGS ...
Page 2: ......
Page 41: ...Remarks A s s e m b l y I n s t r u c t i o n s KBL Tower pureEnergy 5 0 41 ...
Page 42: ...Remarks A s s e m b l y I n s t r u c t i o n s KBL Tower pureEnergy 5 0 42 ...
Page 43: ......
Page 44: ...Ringstraße 24 26 56307 Dernbach Germany fon 49 0 26 89 94 26 0 fax 49 0 26 89 94 26 66 ...