19
● Split unit installation
Figure 13-5
> 300
> 2000
> 300
> 600
(Wall or obstacle)
Air outlet surface
Air inlet surface
Air inlet
surface
Maintenance
cable and
pipeline surface
● Connect two or more units in parallel
Figure 13-6
> 600
> 2000
> 300
● Connect the front and rear parts in parallel
Figure 13-7
> 2000
> 500
> 3000
> 3000
> 300
● Keep a distance of 2000 mm or more between
the unit and the wall surface when the
discharge port faces the wall of the building.
2000
Caution
13.1.3 Requirements for ODU
Installation in Cold Regions
Protect the ODU from direct snowfall and be careful not
to let the ODU become covered in snow.
Snow may accumulate and freeze between the heat
exchanger and the unit casing. This may reduce
operational efficiency. For information on how to prevent
this after installing the unit, please refer to 13.3.3
Drainage.
13.2 Opening and Closing the Unit
13.2.1 Opening the ODU
● Risk of electric shock.
● Risk of burns.
Caution
8-10 kW
X2
Figure 13-9
X3
12-16 kW
Figure 13-10
Snow cover or
shelter
Air outlet
Base
(Height ≥ 150 mm)
Figure 13-8