spokes
Pull the adjacent spokes with your fingers to check whether the
spokes lack tension. If any spokes are loose and weak, you
must check all spokes of both wheels. If there are any
problems, please contact the KAYO dealer.
Engine installation
The steps of engine installation are as follows:
⑴
Hang the engine on the frame (take care to protect the exterior of the engine).
⑵
Install the carburetor on the manifold and tighten with nuts and bolts.
⑶
Install the throttle cable and air filter. The interface should be sealed. Install the clutch control cable.
⑷
Install the transmission chain.
⑸
Install the left rear cover or sprocket cover, tighten it with bolts, pay attention to magneto outlet.
⑹
Install exhaust muffler. The M8 nut and the exhaust pipe sealing ring should be firmly installed, and the
tightening torque should be 25 ~ 30N•m. The exhaust port should not leak during the installation.
Engine maintenance and adjustment
Inspection of bolts and nuts of cylinder and cylinder body
Check at initial 1000km and every 5000km. When cooling engine, tighten bolts and nuts with torque wrench
according to the specified torque.
Torque
M8
28
~
32N.m
M6
10
~
15N.m