Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The
inspection must be carried out by a suitably qualified person. Fill in the page for information about
installation data.
INSTALLATION INSPECTION
Description
Notes (fill: OK / YES / NO/ NA / write more info)
Heating medium
Water circulation system
installed accordingly
Safety valve installed accordingly
Installations according to HVAC
diagram
System is vented
Pressure of the system
__________ bar
Plumping installation company:
Telephone:
Installer:
Date:
Signature:
______________________________
______________________________
______________________________
______________________________
Electrical connections
Main fuses (of the property)
__________ A
Fuses of FIL-SPL
__________ A
Primary side current transformers
installed
conversion ratio: __________
Secondary side current
transformers installed
Current transformer for
observation of internal power
consumption installed
Power limitation taken into use
Electrical installation company:
Telephone:
Installer:
Date:
Signature:
______________________________
______________________________
______________________________
______________________________
Settings
Max. number of allowable power
steps (Menu 2.1.1 Max)
Step time (Menu 2.1.2 Time)
Max. current limit
(Menu 2.2.1 Max)
Miscellaneous
Serial number
Currently measured boiler
temperature
__________ °C
Functionality tested and approved
Note! The installation inspection must be filled for
meeting requirements for manufacturers guarantee.
Summary of Contents for FIL-SPL
Page 43: ...Electrical circuit diagrams models of 31 112 kW ...
Page 44: ......
Page 45: ......
Page 46: ...Electrical circuit diagrams models of 150 300 kW ...
Page 47: ......
Page 48: ......
Page 49: ...Electrical circuit diagrams models of 400 1600 kW ...
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ...We reserve rights to changes Kaukora Ltd 2019 D106159 r4 0 ...