2 – 16
OPERATION
2-8-1 BACKHOE OPERATION
Shown lever pattern A (ISO) type operations.
OPERATIONS
DIRECTION OF LEVER
DIRECTTON OF MACHINE
BOOM
BUCKET
ARM
SWING
When leaving the operator’s seat, stop the engine, lower the bucket and the
blade on the ground.
➁
Lower
Operating
lever (R.H.)
➀
Raise
➁
Dump
Operating
lever (R.H.)
➀
Dig
Operating
lever (L.H.)
➁
Out
➀
In
Operating
lever (L.H.)
Swing
right
➀
Swing
left
➁
Swing
right
➀
Swing
left
➁
➁
Lower
➀
Raise
➁
Dump
➀
Dig
➁
Out
➀
In
Summary of Contents for 17VXE
Page 2: ......
Page 62: ...2 1 8 ...
Page 110: ...5 1 HYDRAULIC SYSTEM DIAGRAM 5 1 HYDRAULIC SYSTEM DIAGRAM 2 9 30 ...
Page 118: ...MINI EXCAVATOR 17VXE PUBLISHED MARCH 2017 KATO IMER S p A ITALY ...
Page 119: ......
Page 120: ......