40
English
5.906-590.0 Rev. 01 (05/17)
ABGL Uninstall / install appliance cover on the left side
ADAT Open / close carrier
1 Screws
2 Holder solenoid valves
3 Covers
4 Nuts
5 Covering plate
Unscrew the screws.
Remove the holder for the solenoid valves.
Put the solenoid valves to the side.
Remove covers.
Loosen the mounting nuts.
Remove the covering plate.
1 Electric socket plug connections
2 Low-water thermostat
3 Cable tie
4 Screw connections
5 Probe thermostat water shortage
6 Steam boiler
Lift the steam boiler.
Disconnect screw connections.
Separate the electric connectors.
Remove the cable ties.
Pull the probe of the water shortage thermostat out of
the steam boiler.
Remove the thermostat water shortage.
1 Low-water thermostat
2 Bracket
3 Nut
4 Cover cap
Remove the cover cap.
Loosen the nut.
Remove support.
Installation information
Insert the probe thermostat water shortage all the way to
the stop.
ADTW Uninstall / install water shortage thermostat