English
25
Remove the water reservoir for filling
1. Pull the water reservoir vertically upwards.
2. Fill the water tank vertically with tap water or a mix-
ture of tap water and no more than 50% distilled wa-
ter up to the "MAX" mark.
3. Insert the water reservoir and press downwards until
it locks into place.
Filling the water reservoir directly on the device
1. Fill tap water or a mixture of tap water and no more
than 50% distilled water from a vessel into the filling
hole of the water reservoir up to the "MAX" mark.
Switch on the device
Note
If there is no or too little water in the steam boiler, the
water pump starts to run and pumps water from the wa-
ter reservoir into the steam boiler. The filling process
can take several minutes.
Note
The device briefly closes the valve every 60 seconds
causing an audible soft click. Closing prevents the valve
from clogging. This does not affect the steam output.
1. Place the device on a firm surface.
2. Insert the mains plug into a socket.
3. Press the ON switch.
The green heating indicator light flashes.
4. Wait until the green heating indicator stays on.
5. Press the steam lever.
Steam leaks out.
MAX 0.8 l
2.
1.
MAX 0.8 l
1.
2.
1.
2.
Summary of Contents for SC 4 EasyFix Iron Plug
Page 1: ...SC 4 EasyFix Iron Plug SC 4 EasyFix Premium Iron Plug 59683160 07 18 2 English 17...
Page 2: ...2 l IEC 60364 1 l 3x1 mm...
Page 3: ...3 30 SC 1 SC 3 l 0 C SC 3...
Page 4: ...4 REACH www kaercher com REACH www kaercher com 4 4 4 4 4 4 5 6 7 8 11 11 13 14 14...
Page 5: ...5 K RCHER K RCHER...
Page 6: ...6 43 33 36 38 44...
Page 8: ...8 4 5 6 a 1 b 2 1 7 1 2 3 50 1 2 1 2...
Page 9: ...9 1 2 50 MAX 3 1 50 MAX 60 1 2 3 4 5 3 1 2 MAX 0 8 l 2 1 MAX 0 8 l 1 2 1 2...
Page 10: ...10 3 50 1 50 MAX 1 2 3 4 5 6 10 1 2 3 4 5 6 7 1 2 1 3 4 5 1 2...
Page 11: ...11 6 7 8 9 1 10 20 cm 5 1 1 1 1 1 2...
Page 12: ...12 1 2 PVC 1 2 3 a b 1 1...
Page 15: ...15...
Page 16: ...16...