9
Set programme switch to step 1 (driv-
ing). Roller brush is raised.
Turn main key to "0" and remove it.
Secure the machine with wheel
chock(s) to prevent it from rolling away.
Raise slightly the waste containers on
both sides and pull them out.
Loosen the front attachment screw of
the right-hand side panel.
Loosen the rear attachment screw on
the right-hand side panel.
Remove side panel.
Loosen the screws.
Loosen the attachment screw of the
bowden cable and remove the bowden
cable.
Unscrew the screw on the pivoting point
of the roller brush arm.
Pull out roller brush swinging arm.
Remove the roller brush cover.
Pull out roller brush.
Installation position of roller brush in direc-
tion of travel
Push new roller brush into the roller
brush housing and onto the drive pin.
Note:
When installing the new roller brush,
ensure correct positioning of the bristle as-
sembly.
Note:
Adjust the bowden cable, so that the
roller brush is lifted approx. 10 mm off the
floor.
Position roller brush cover.
Install the roller brush arm.
Hook the Bowden cable in.
Tighten the fastening screws.
Screw on side panel.
Push in the waste containers on both
the sides and lock them.
Set programme switch to step 1 (driv-
ing). The side brush and roller brush are
raised.
Drive sweeper on to a smooth, even
surface covered with a visible layer of
dust or chalk.
Set programme switch to step 2. Roller
brush is lowered. Slightly press down
on the drive pedal and allow the sweep
brush to briefly rotate.
Raise roller brush.
Press pedal which raises bulk waste
flap and keep pressed.
Drive machine backwards.
The sweeping track should have an even
rectangular shape which is between 50 and
70 mm wide.
Note:
The side brush floating mounting of
the roller brush adjusts the sweeping track
as the bristles wear down. The roller brush
must be replaced if it becomes too worn.
Park the sweeper on an even surface.
Set programme switch to step 1 (driv-
ing). Roller brush is raised.
Turn main key to "0" and remove it.
Secure the machine with wheel
chock(s) to prevent it from rolling away.
Raise slightly the waste containers on
both sides and pull them out.
Open the fastening screws of the side
panels on both sides.
Remove side panels.
Front sealing strip
Slightly loosen retaining nuts for the
front sealing strip; to replace, unscrew.
Screw on new sealing strip without fully
tightening the nuts.
Adjust sealing strip.
Set the distance of the sealing strip to
the floor so that the bottom edge trails
behind at a distance of between 35 and
40 mm.
Tighten nuts.
Check the sweeping mirror of the
sweeping roller
Adjusting and replacing sealing strips
26
EN
Summary of Contents for KM 100/100 R LPG
Page 3: ...2...
Page 165: ...2 BGG 936 33 37 UVV BGV D34 1 Nekal TRF 1996 DA BGV D 34 4 DA BGV D34 2 164 EL...
Page 166: ...3 3 4 5 2 1 REACH www kaercher com REACH 165 EL...
Page 167: ...4 1 2 3 4 5 KM 100 100 R LPG 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 166 EL...
Page 168: ...5 6 km h 11kg 1 2 30 mm 3 KM 100 100 R P 1 cm KM 100 100 R LPG 1 2 3 KM 100 100 R 167 EL...
Page 172: ...9 1 0 3 1 0 1 0 171 EL...
Page 173: ...10 10 mm 1 2 50 70 mm 1 0 35 40 mm 5 10 mm 172 EL...
Page 174: ...11 1 2 mm 0 1 3 1 3 5 173 EL...
Page 176: ...13 Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher 175 EL...
Page 195: ...3 3 4 5 2 1 REACH www kaercher com REACH 194 RU...
Page 196: ...4 1 2 3 4 5 KM 100 100 R LPG 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 195 RU...
Page 197: ...5 6 11 1 2 30 3 KM 100 100 R P 92 1 KM 100 100 R LPG 1 2 3 KM 100 100 R P 196 RU...
Page 201: ...9 6 1 0 3 1 0 1 0 200 RU...
Page 202: ...10 10 1 2 50 70 1 0 35 40 5 10 201 RU...
Page 203: ...11 1 2 0 1 3 202 RU...
Page 205: ...13 Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher Kaercher 204 RU...
Page 267: ......
Page 268: ......