                                                        Installation, commissioning and testing quick guide I Jan 1, 2023 | version 1.0  P10 

15

 

R

OADMAP FOR FINAL COMMISSIONING

 

15.1

 

P

OWER OFF STEP ONE

 

Make sure that both power supplies on the NCP are turned off. 

15.2

 

S

TEP TWO NETB 

 

Open the NETB connected to the NCP  

Make sure the aerosol generators are disconnected 

  

 

 

 

 

 

 

Check if the wiring is all connected correctly 

 

 

 

 

 

 

 

 

 

 

 

Check the last ETB for the end off line diode switch 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISCONNECT EXTINGHUISHER

 

 

 

 

Move the disconnect switch in the YES 
position  and  the  aerosol  extinguisher 
is  disabled  and  can  not  be  activated. 

All  ETB’s  connected  thereafter  will 

remain  in  operation.  A  disablement 
will be signalized as fault on the NCP. 

ENABLE END OF LINE DIODE

 

 

 

 

To  monitor  for  short  circuit  or  wire 
break, only the end of line switch on the 
last  ETB  must  be  set  into  the  YES 
position.  A  failure  to  do  so  will  be 
signalized as a fault on the NCP.   

Summary of Contents for NANO MARINE

Page 1: ...this manual may be reproduced stored in an automated database or made public in any form or by any means either electronically mechanically or by photocopying recording or in any other way without pri...

Page 2: ...EXTINGUISHERS TO NETB 7 12 CONNECTING CABLE TO EXTINGHUISHERS CONNECTOR 8 13 SOUNDER OUTPUT 9 14 EXTERNAL EXTINGHUISING RELEASE 9 15 ROADMAP FOR FINAL COMMISSIONING 10 15 1 POWER OFF STEP ONE 10 15 2...

Page 3: ...CFR15 ICES 003 ANSI 63 4 IEC60945 pt11 and a DNV marine type approval according the DNV Class Guideline 0339 2021 certificate TAA000037H For that the NMS has endured extensive environmental tests such...

Page 4: ...e two extinguisher terminal boxes NETB These NETB boxes must be placed outside but in the immediate vicinity of the protected room One is suitable for connecting up to 5 extinguishers and one for up t...

Page 5: ...2 CP 18 CP 17 see wiring diagram 10K 10K 10K RELEASE HOLD 10K not in use Sounder Hold PSU 2 8V DC to 28V DC 8 7 6 5 4 3 2 1 ON OFF DIP NC NO C NC NO C NC NO C 8 7 6 5 4 3 2 1 extinguishant delay timer...

Page 6: ...IP NC NO C NC NO C NC NO C 8 7 6 5 4 3 2 1 extinguishant delay timer switches relay 1st or 2nd stage fire single or dual zone alarm vehicle mode extinguishing release output current puls or voltage EO...

Page 7: ...vehicle mode extinguishing release output current puls or voltage EOL 10K RESITOR EOL 10K RESITOR EOL 10K RESITOR EOL 10K RESITOR external release external release external hold release external hold...

Page 8: ...Strip cable jacket at the end of the cable meant to connected the fire extinguisher and finish the two wires with insulated crimp bootlace ferrules 3 Follow stricktly the wring specifications of the c...

Page 9: ...i 2 3 4 i 5 i 6 i 7 8 i 9 OPTION OPTION OPTION OPTION PSU 1 PSU 2 NANO EXTINGUISHING RELEASING PANEL NCP ON THE BRIGDE FROM NCP TO NETB WITH THREE 2 CORE CABLES 1 1 NANO 22 1 2 NANO 23 2 1 NANO 24 2 2...

Page 10: ...all connected correctly 4 Check the last ETB for the end off line diode switch DISCONNECT EXTINGHUISHER Move the disconnect switch in the YES position and the aerosol extinguisher is disabled and can...

Page 11: ...3 on off ETB 4 on off EXT 1 EXT 2 ETB 1 on off ETB 2 on off IN The ETB dip switch positions on a NETB 10 in use with 7 Stat X extinguishers End Of Line switch Disconnect Extinguisher switch 15 3 EXAM...

Page 12: ...AL RELEASE ONLY 1 Front NCP manual release ONLY fire detectors are not in use PDS 1 OFF 2 The vehicle mode is disabled is not in use PDS 2 OFF 3 Activation of electrical igniters for aerosol fire exti...

Page 13: ...the connection diagram below The recommended setting gives the best and deviating alarm signal compared to the usual evacuation alarm signal on vessels Recommended setting sounder beacon C D OFF TONE...

Page 14: ...servability of the of the optical alarm signal in the protected area In a noisy environment the optical alarm signal is the main warning element Recommended setting sounder beacon C D OFF IN IN TONES...

Page 15: ...eous the extinguishing release buttons on the front of the NCP 9 Confirmation of extinguisher activation As confirmation of a successful extinguishment activation the red LEDs on the extinguishers ter...

Page 16: ...y form or by any means either electronically mechanically or by photocopying recording or in any other way without prior written permission from K G GROEP B V The policy of the K G GROEP B V is one of...

Reviews: