![Kamstrup M-Bus Master MultiPort 250D Installation And User Manual Download Page 41](http://html1.mh-extra.com/html/kamstrup/m-bus-master-multiport-250d/m-bus-master-multiport-250d_installation-and-user-manual_3354057041.webp)
41
Kamstrup A/S • 5512853_C1_GB_01.2017
M-Bus Master MultiPort 250D
System Log
System Log shows events in the
master.
Each event is timestamped by the
master’s built-in real-time clock.
7.12.6 Factory settings
The master’s settings can be
restored to the default values it had
when it was produced.
Please note that loggers are reset
too.
7.12.7 Communication Test
Communication test is used for
testing communication between the
master and a meter.
The test can be used with either
primary or secondary addressing and
one, more or all baud rates. Setting is
done via the function and arrow keys.