Kamstrup flowIQ 4200 Installation Manual Download Page 12

12

Kamstrup A/S • 55123307_A1_EN-US_06.2022

Installation guide flowIQ® 4200

•  Repeat the same procedure on the opposite pipeline flange
•  Lift the meter via the two lifting lugs and lower the meter into place
•  Pre-tighten the remaining bolts and nuts 
•  Tighten the bolts in the described criss-cross pattern and with the correct tightening 

torque mentioned in the table

•  Repeat the sequence three times to ensure that all bolts are tightened with the correct 

torque  

4.4  Installation angle

For flowIQ® 4200, it applies that the meter can be mounted at all angles and in all 
positions.
However, it is recommended to mount the display in such a way that it is easy to read.

4.5  Straight inlet

Normally, the meter requires neither straight inlet nor straight outlet to achieve accurate 
measurement. However, for installation environments with heavy flow disruptions, 
several lengths of straight inlets are advisable. This applies to all flange meters.

4.6  Flow disturbance and flow cavitation

The components mentioned below can generate heavy flow disruptions or pressure drops: 
•  Butterfly valve
•  Pressure- and flow-regulated components
•  Partially closed ball valve
•  Pumps in front of the meter
•  Pumps after the meter
•  Double conjugation in several directions    

4.6.1  Service connection

When the meter has been mounted in the system, neither welding nor freezing is 
allowed. The meter must be dismounted from the system before starting such work. 
If the electrical service in the building has been grounded via the plumbing, it must be 
ensured that adequate electrical ground is maintained both during and after installation. 
In order to facilitate replacement of the meter, closing valves should be mounted on 
both sides of the meter. Under normal operating conditions, a strainer is not required in 
front of the meter.

Note!

 To enlarge the gasket gap, utilize the pushing nut milling with a bolt and a nut.

Note!

 Cavitation affects the measurement accuracy and may physically damage the meter.

Summary of Contents for flowIQ 4200

Page 1: ...Installation guide flowIQ 4200 US Kamstrup Water Metering LLC 245 Hembree Park Drive Ste 110 Roswell GA 30076 USA info us kamstrup com...

Page 2: ...installation 6 4 1 Sediments in the water 7 4 2 Spool piece installation only applies to 6 and 8 meters 7 4 3 Split flange installation 8 4 3 1 General flange features and specifications 9 4 3 2 Criss...

Page 3: ...the correct flow direction Ensure correct operating pressure Avoid placing the meter in direct sunlight For meters subjected to any kind of mechanical impact it is recommended to install a lid on the...

Page 4: ...e mechanical impact For flowIQ 4200 meters it is possible to install a lid The lid can be ordered as a separate accessory and will not be attached or mounted on the meter from factory Lid type no 66 9...

Page 5: ...2 Installation precautions The sealing surface of the flanged connection must be clean and level Replace gaskets when installing a new water meter ALWAYS use new gaskets Gaskets in original quality i...

Page 6: ...er detects reverse flow The meter calculates the volume in a separate register not verified for billing Reverse volume is NOT displayed on the meter 4 flowIQ 4200 installation A flowIQ 4200 meter is d...

Page 7: ...ts to install the meter with the cup facing upwards 4 2 Spool piece installation only applies to 6 and 8 meters Spool pieces should be mounted on the pipeline flanges first to ensure flexible options...

Page 8: ...ce depends on the installation scenarios and the space conditions Both options are described below and both installation options require the same procedure for tightening the flange bolts in the descr...

Page 9: ...parts during installation Pushing nut milling If extra space for the gasket is needed insert a 7 16 nut in the pushing nut milling and insert a 7 16 bolt from the opposite side to press and enlarge th...

Page 10: ...s below 4 3 3 Installing the split flanges on the meter first Place the meter vertically on one end Fixate the two split flanges together by using a bolt Place the flange around the meter and close th...

Page 11: ...lts and nuts Tighten the bolts in the described criss cross pattern and with the correct tightening torque mentioned in the table Repeat the sequence three times to ensure that all bolts are tightened...

Page 12: ...inlets are advisable This applies to all flange meters 4 6 Flow disturbance and flow cavitation The components mentioned below can generate heavy flow disruptions or pressure drops Butterfly valve Pr...

Page 13: ...suant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate ra...

Page 14: ...been approved by Innovation Science and Economic Development Canada to operate with the antenna types listed below with the maximum permissible gain indicated Antenna types not included in this list t...

Page 15: ...riel brouilleur du Canada Cet metteur radio IC ID 22376 KWM4220 a t approuv par Innovation Sciences et D veloppement conomique Canada pour fonctionner avec les types d antenne num r s cidessous avec l...

Page 16: ...16 Kamstrup A S 55123307_A1_EN US_06 2022 Installation guide flowIQ 4200...

Reviews: