If the installation of the thermostove provides
interaction with another existing system
complete with a heater (gas boiler, gas boiler, oil
boiler, etc..) consult qualified personnel who can
then answer the compliance of the system, as
envisaged by the law in force.
Flushing the system
In accordance with the UNI-CTI 8065 is
strongly recommended to wash the entire
system before connecting it in order to get
rid of residues and deposits.
After flushing
the system to protect it against corrosion and
deposits, it is recommended the use of inhibitors.
Upstream from the stove, always install shutters
so as to disconnect it from the plumbing system
should it be necessary to move it, or when it
requires routine and/or special maintenance.
Connect the stove using hoses so that the stove
is not too strictly connected to the system, and
to allow slighht movement.
These are as helpful as the supply and return
piping system if the heating system is on a
higher floor than the boiler.
The exhaust pipe pressure is connected
temporarily to a carafe or a funnel to avoid,
in case of overpressure, that the water gush
bathrooms and the structure and the floor.
Filling the thermostove funding of sanitary kit
Once all the water connections, proceed to
check pressure seal by filling the thermostove.
During this operation, any air in the system is
released from the
automatic vent valve
.
The filling pressure of the system
when cold
must be
1 bar
.
During operation, if the system pressure drops
(due to evaporation of dissolved gases in
the water) to values lower than the minimum
indicated above, the user must use the filling
tap to bring the pressure back up to its normal
pressure.
For proper operation of the stove
when hot
, the
pressure in the boiler must be
1,5 bar
.
STOPPER BLOCKED
LOOSE STOPPER
ONE TURN
VENTING
SAFETY
VALVE