3/32"
Y
3
Measure dimension
“Y”
from the
finished wall.
2
Remove the plaster guard.
1
Using the guard as a handle, turn
the water off.
Record your model number below
for future reference:
Observe all local plumbing and
building codes.
WARNING: Risk of scalding.
High water temperature can
cause severe burns. Set the water
temperature at or below 120°F
(49°C) following the adjustment
procedure in the valve Installation
and Care Guide.
8
To adjust handle position, rotate
the adapter one tooth. Repeat until
aligned.
7
Dry fit the handle to confirm
vertical alignment.
6
Install the correct parts according
to
“Y.”
Verify level.
5
Make sure the valve is closed.
Y
> 2" (51 mm)
Y
= 1-3/4" (44 mm)-
2" (51 mm)
1-5/8"
(41 mm)
2"
(51 mm)
4
Use parts according to dimension
“Y.”
13
Point the handle down and slide
onto the stem.
12
Position the bearing on the
bonnet, curved side out.
11
Securely tighten the bonnet.
Faceplate
Bonnet
10
Position the faceplate with the
logo at the top. Hold the faceplate
in place and thread the bonnet
onto the valve.
9
Install the correct screw according
to dimension
“Y.”
3/32"
15
Secure the handle with the
setscrew.
Bearing
Spacer
14
If the handle contacts the bonnet,
remove the bearing and install a
spacer. Reinstall the bearing.
1286745-2-
A