background image

INSTALLATION INSTRUCTIONS

One™ Console Table

1110776_2_A

3 of 6

Questions? Problems? For additional assistance, please contact Kallista’s Customer

Service Department at 1-888-4KALLISTA (1-888-452-5547) or FAX 1-888-272-3094.

 PRePARe THe SITe

1. 

Finished 

Floor    

Wall Bracing  

(2x6 minimum)

CL

 Finished

    Wall 

 Foot  

 Anchor

 Holes 

CL

21-3/8”

(54.3 cm)

 12-27/32” 

(32.6 cm) 

Mark the

anchor

holes.

35-3/4”

(90.8 cm)

Rough-in the water supply lines and the drain piping.

 

‰

Install a minimum of a 2x6 as a wall brace to provide support for 

 

‰

the wall bracket. The brace should be the same length as the 

console table, 26” and should be positioned 35-3/4” from the 

finished floor to the top edge of the board. The center of the wall 

brace should be in-line with the drain outlet.
Finish the wall.

 

‰

Mark the centerline on the floor and the wall.

 

‰

Mark the location of the holes on the floor for the feet anchors.

 

‰

Drill a hole 1/4” D. x 1/2” deep, in the finished floor for each foot 

 

‰

anchor. The holes should be 21-3/8” from the wall and 12-27/32” 

from the centerline. 

 

 

 

 

 

 

 

 

 

 ASSeMBLe THe FRONT CONSOLe TABLe LeGS

2. 

 Towel Bar 

 Table Leg 

Assembly 

 Verify socket head   

screws are hand tight,

 tighten if necessary   

 Set Screws 

Check that the socket head screws on the towel bar 

 

‰

mounting assemblies are tight on both leg assemblies.
Assemble the two towel bars to one leg assembly using two 

 

‰

setscrews.
Assemble the second leg assembly to the open end of the 

 

‰

towel bars with the remaining two setscrews.

Reviews: