
INSTALLATION GUIDE
KALE FANS
www.kalefans.net
INSTALLATION GUIDE
EURUS
-10-
-9-
5. Installation Condition and Mounting
5.1 Installation Condition
5.2 Common Mounting
7.3M(24FT)
motor height=0.8M
0-6M extension tube
Hanging on I-beam
Hanging on Concrete
Mounting on I-beam: first confirm the mounting
position; then assemble top plate,spacer and
beam clip.
Keeping the beam is in the mddile of the top
plate, and top plate is vertical; spacer and beam
clip must
fit together the beam.
Side Mount on I-beam
Side mount on I-beam: confirm the size of the beam, and
the position to weld bracket and guarantee to keep
the distance from the bottom of beam to fan blade no less
and then full welding after confirming the balanceof bracket.
At last clean welding slag and paint as before.
Assemble extended top plate with bending pieces, to fit the
concrete beam. Keep top plate vertical referring to the beam
bottom. Dig holes marked at first with percussion drill, the
depth of the hole refers to the length of expansion bolt. Drive
expasion bolts into the holes and then mount fasteners for
bending pieces
Side Mount on Concrete
Confirm the size of the concrte beam, and
the position to mount bracket and guarantee to keep
the distance from the bottom of beam to obstacles no less
Dig holes marked at first with percussion drill, the
depth of the hole refers to the length of expansion bolt. Drive
expasion bolts into the holes and then mount side-mounted
brackets and tighten fasteners.
Two steel plates hoop the beam with 4 pcs studs,
tighten with doubled nuts and washers to guarantee
the structure’s stability.
Confirm installtion position, it’s better that the position is
close to the pipe connection. Measure the pipe’s diameter,
if its diameter is less than 15cm, keep brackets mounted along
the pipe. Cut stud, and each stud length should be 10cm longer
than [pipe. Mount top plate under the pipes and tighten the
brackets to keep steady.
Mount on Bent Structure
Mount on Pipe/Tube Structure