background image

har

dw

ar

e k

e

y

kaboodle.com.au

A

A

B

st

ep 2

p.

 

2

Ver. 2

W-50530

1.

343mm

29
5mm

29
5mm

343mm

133mm

133mm

229mm

229mm

34

1mm

34

1mm

37mm

37mm

235mm

235mm

393mm

393mm

16mm  

wood screws

runners

pre-drilling for runners

separating runners

attaching runners

pre-drilling for lid brackets

3.

2.

4.

2 x 11L

 side mount pullout bin 

A

A

B

On both sides of your cabinet, draw a horizontal line 343mm up 
from the bottom. Measuring from the front of the cabinet along 
these lines, mark out the pre-drill holes at 133mm, 229mm and 
341mm as pictured above. Use a 2mm drill bit to pre-drill holes 
to a depth of roughly 2.5mm.

Separate each runner (A) into two parts by extending the guide 
(i) and pushing up on the lever (ii) while continuing to pull apart 
the two components. The guide should separate easily from the 
runner without too much force being applied.

Using the lower sets of pre-drilled holes, align with the 
holes on the runners (A) and fix to the cabinet using  
6 x 16mm wood screws (B) as pictured above. 

On both sides of your cabinet, draw a horizontal line 295mm up 
from the bottom. Measuring from the front of the cabinet along 
these lines, mark out the pre-drill holes at 37mm, 235mm and 
393mm as pictured above. Use a 2mm drill bit to pre-drill holes 
to a depth of roughly 2.5mm.

(ii)

(i)

Summary of Contents for 2x11L Side Mount Pullout Bin

Page 1: ...cent cabinet doors and handles prior to installation Make sure you leave plumbing and electrical work to qualified trades people Never try this yourself Make sure you always use safety gear like a mask ear muffs and glasses when using tools Tip After marking out the pre drill holes as per the instructions take the part that is to be installed and align the appropriate holes with the markings to en...

Page 2: ...41mm as pictured above Use a 2mm drill bit to pre drill holes to a depth of roughly 2 5mm Separate each runner A into two parts by extending the guide i and pushing up on the lever ii while continuing to pull apart the two components The guide should separate easily from the runner without too much force being applied Using the lower sets of pre drilled holes align with the holes on the runners A ...

Page 3: ...ching lid brackets 5 6 B C Using the top sets of pre drilled holes align with the 2nd 5th and 7th holes on the lid brackets C and fix to the cabinet using 6 x 16mm wood screws B as pictured above 2 x 11L side mount pullout bin Carefully slide the guide back into the runner The runners should open and close smoothly if assembled correctly Extend the runners once they have been correctly reassembled...

Page 4: ...ut and pre drill four holes on the inner side of your cabinet door as pictured above Use a 2mm drill bit to pre drill holes to a depth of roughly 2 5mm 2 x 11L side mount pullout bin 3 7 m m 3 7 m m 195mm 195mm 291mm 291mm F H Slide the door mount brackets onto the runner brackets i ensuring the height adjustment screws H slip into the notches ii Screw through the top and bottom holes of the runne...

Page 5: ...Hinges runners and other parts and accessories should be kept dry at all times To keep the mechanisms performing at their best regularly wipe them with a dry cloth removing any dust and grime that may build up In case of spills clean immediately with a dry cloth Do not use harsh abrasives If you need any more information you can contact us Australia 1800 666 078 Monday to Friday between 8 00am and...

Reviews: