Introduction
1
1 Introduction
1.1 Overview
The USB-62401 is a 24-bit, 4-channel simultaneous-sampling universal
input USB DAQ module featuring built-in signal conditioning and direct
measurement of commonly used sensors, including current output
transducers, thermocouple, RTD, load cell, strain gauge, and resistance.
Individual channels can be programmed to measure different signal
types.
The USB-powered USB-62401 is equipped with removable screw-down
terminals for easy device connectivity, and the included multi-functional
stand fully supports desktop, rail, or wall mounting.
The USB-62401 is suitable for basic measurement applications requiring
high resolution and accuracy, laboratory research and material testing
environments, and industrial temperature measurement. U-Test, a free
ready-to-use testing program is included to enable operation or testing
of all JYTEK USB DAQ series functions with no programming require
-
ments.
1.2 Features
High-speed USB 2.0
USB powered
4-CH simultaneous-sampling analog input
Built-in signal conditioning for high voltage/current/thermocou
-
ple/RTD/strain gauge/load cell/resistance measurement
Sample rate from 20 S/s to 2 kS/s
Functional digital I/O
Removable screw-down terminal
Lockable USB cable for secure connectivity
Ready-to-use testing application (U-Test) provided
Summary of Contents for USB-62401
Page 2: ...ii...
Page 8: ...viii List of Figures This page intentionally left blank...
Page 10: ...x List of Tables This page intentionally left blank...
Page 21: ...Introduction 11 Figure 1 3 USB 62401 Module Side View...
Page 22: ...12 Introduction Figure 1 4 USB 62401 Module Front View...
Page 24: ...14 Introduction Figure 1 7 Module In Stand Front View...
Page 25: ...Introduction 15 Figure 1 8 Module Stand Top View 20 4 20 4 B 26...
Page 29: ...Introduction 19...
Page 30: ...20 Introduction This page intentionally left blank...
Page 34: ...24 Getting Started Figure 2 4 Module Pre Rail Mounting Figure 2 5 Module Rail Mounted...
Page 36: ...26 Getting Started This page intentionally left blank...
Page 43: ...Operation 33 Figure 3 7 4 Wire RTD Connection Figure 3 8 3 Wire RTD Connection...
Page 56: ...46 Calibration This page intentionally left blank...
Page 62: ...52 Getting Service...