42
Operation
Mode 6: Re-Triggered Single Pulse Generation
This mode is similar to Mode 5 except that the counter generates a
pulse following every active edge of GPTC_GATE. After software
start, every active GPTC_GATE edge triggers a single pulse with pro
-
grammable delay and pulse width. Any GPTC_GATE triggers that
occur when the prior pulse is not completed are ignored. Generation
of two pulses with a pulse delay of two and a pulse width of four is
shown.
Figure 3-16: Mode 6-Re-Triggered Single Pulse
Mode 7: Single-Triggered Continuous Pulse Generation
This mode is similar to Mode 5 except that the counter generates
continuous periodic pulses with programmable pulse interval and
pulse-width following the first active edge of GPTC_GATE. When the
first GPTC_GATE edge triggers the counter, GPTC_GATE has no effect
until software start is executed again. Generation of two pulses with
a pulse delay of four and a pulse-width of three is shown.
Figure 3-17: Mode 7-Single-Triggered Continuous Pulse
Mode 8: Continuous Gated Pulse Generation
This mode generates periodic pulses with programmable pulse inter
-
val and pulse-width following software start. GPTC_GATE
enables/disables calculation. When GPTC_GATE is inactive, the
2
2
1
0
3
2
1
0
2
2
1
0
3
2
1
0
2
2
G a t e
C L K
C o u n t v a l u e
O U T
S o f t w a r e s t a r t
I g n o r e d
4
4
4
3
2
1
0
2
1
S o f t w a r e s t a r t
0
3
2
1
0
2
1
0
3
2
G a t e
C L K
C o u n t v a l u e
O U T
Summary of Contents for USB-62401
Page 2: ...ii...
Page 8: ...viii List of Figures This page intentionally left blank...
Page 10: ...x List of Tables This page intentionally left blank...
Page 21: ...Introduction 11 Figure 1 3 USB 62401 Module Side View...
Page 22: ...12 Introduction Figure 1 4 USB 62401 Module Front View...
Page 24: ...14 Introduction Figure 1 7 Module In Stand Front View...
Page 25: ...Introduction 15 Figure 1 8 Module Stand Top View 20 4 20 4 B 26...
Page 29: ...Introduction 19...
Page 30: ...20 Introduction This page intentionally left blank...
Page 34: ...24 Getting Started Figure 2 4 Module Pre Rail Mounting Figure 2 5 Module Rail Mounted...
Page 36: ...26 Getting Started This page intentionally left blank...
Page 43: ...Operation 33 Figure 3 7 4 Wire RTD Connection Figure 3 8 3 Wire RTD Connection...
Page 56: ...46 Calibration This page intentionally left blank...
Page 62: ...52 Getting Service...