18
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
GB
• When ducting the hood through the side air outlet from
the lower chimney element
I
it is necessary to insert
deflector
D
into spigot
R
to close off the opening that is
not being used (
fig.6
).
• Cut the additional spigot
P
in correspondence with outlets
1 and 2 , which must be formed directly on the piece.
Connect the additional spigot
P
to the round fan outlet,
pushing it downwards, and fit spigot
R
to additional spigot
P
in a similar manner (make sure that the two additional
side recirculation spigots
P1
are fitted to spigot
R
). Make
sure that the height of the assembly
R
+
P
corresponds
to the height of the chimney outlet (
fig. 7
).
• If the hood is supplied with the activated charcoal filters
fitted, the filters should be removed (see paragraph on
Maintenance ).
• Recirculation fitting
• The filtered air is returned to the room through the two
plastic side grills G on the lower chimney element I .
• Connect the additional spigot
P
to the round fan outlet,
pushing it downwards, and fit spigot
R
to additional spigot
P
in a similar manner (make sure that the two additional
side recirculation spigots
P1
are fitted to
spigot
R
). Cut the additional spigot
P
in
correspondence with outlets 1 and 2 , which
must be formed directly on the piece. Make
sure that the height of the assembly
R
+
P
corresponds to the height of the chimney
outlet.(
fig.7
).
• Fit the activated charcoal filters inside the
canopy (see paragraph on
Maintenance
).
Do not fit the venting grilles until after the
chimney has been installed.
Fig. 6
Fig. 7
D
R
P1
P1
P
D
R
P1
P1
P
R
P1
P1
P
G
R
P1
P1
P
G
Summary of Contents for JDK5575E
Page 2: ...2 ...