The minimum front and rear clearance requirements depends on the mounting configuration you choose.
The minimum total clearance inside the cabinet is 36.20 in. (91.95 cm) between the inside of the front
door and the inside of the rear door.
NOTE:
If you are installing the MX2010 router into a network cabinet, make sure that no
hardware, device, rack, or cabinet component obstructs the 34-U rack space from access during
installation.
RELATED DOCUMENTATION
Clearance Requirements for Airflow and Hardware Maintenance for the MX2010 Router | 147
MX2010 Cabinet Airflow Requirements | 127
MX2010 Rack-Mounting Hardware | 43
MX2010 Rack Requirements | 135
MX2010 Chassis Moving Guidelines
The fully configured chassis with the cable managers weighs up to 985 lb (446.79 kg), or 324 lb (146.96 kg)
with components removed. Observe the following guidelines for moving the router:
•
Before moving the router, read the
“Overview of Preparing the Site for the MX2010 Router” on page 125
to verify that the intended site meets the specified power, environmental, and clearance requirements.
•
Do not attempt to move a fully-configured router by yourself. Use a pallet jack with the attachment and
a four-person team to maneuver the router into a rack.
•
Before moving the router, disconnect all external cables.
To move routing devices and components, use the following guidelines:
•
1 person to lift or move up to 39.7 lb (18.0 kg)
•
2 people to lift or move up to 70.5 lb (32.0 kg)
•
3 people to lift or move up to 220 lb (99.8 kg)
•
4 people to lift or move over 300 lb (136.0 kg)
As when moving any heavy object, lift most of the weight with your legs rather than your back. Keep
your knees bent and your back relatively straight and avoid twisting your body as you lift. Balance the
load evenly and be sure that your footing is solid.
129
Summary of Contents for MX2010
Page 1: ...MX2010 Universal Routing Platform Hardware Guide Published 2019 12 03...
Page 28: ......
Page 30: ...MX2010 Power System Description 95 MX2010 Cooling System Description 45 4...
Page 144: ...MX2010 DC Power 48 V System Electrical Specifications 201 122...
Page 146: ......
Page 233: ......
Page 273: ...Figure 98 Loading the MX2010 Router into the Rack g007436 256...
Page 294: ...Figure 113 Reinstalling an AC Power Distribution Module g007440 D 277...
Page 295: ...Figure 114 Reinstalling a DC Power Distribution Module 48 V D g007432 278...
Page 373: ...4 PART Installing and Replacing Components Installing Components 359 Replacing Components 429...
Page 374: ......
Page 620: ......
Page 715: ...6 PART Troubleshooting Hardware Troubleshooting Components 703...
Page 716: ......
Page 744: ......
Page 772: ......
Page 775: ...763...
Page 783: ...772...
Page 796: ...Jewelry Removal Warning 787...
Page 799: ...Operating Temperature Warning 790...
Page 808: ...DC Power Disconnection Warning 799...
Page 812: ...DC Power Wiring Sequence Warning 803...