RELATED DOCUMENTATION
Installing an MX2010 Router Overview | 215
Unpacking the MX2010 Router | 222
Clearance Requirements for Airflow and Hardware Maintenance for the
MX2010 Router
When planning the installation site, you need to allow sufficient clearance around the rack for airflow and
hardware maintenance. The clearance requirements vary, depending on whether the MX2010 uses AC or
DC power and whether the MX2010 has a standard or extended cable manager.
NOTE:
There are no additional clearance requirements to accommodate the depth of the MX2010
power distribution modules (PDMs) and power supply modules (PSMs); they are within
specification.
When planning for adequate clearance for airflow and hardware maintenance, keep the following in mind:
•
For the cooling system to function properly, the airflow around the chassis must be unrestricted.
•
Airflow must always be from front to back with respect to the rack. This ensures that fresh air from the
front of the rack is supplied to the inlets, and the exhaust exits the rear of the rack.
•
Check the cables to ensure there is no air leakage.
•
There must be a minimum of 34-U of usable rack space when you install the MX2010.
•
For service personnel to remove and install hardware components, there must be adequate space at the
front and back of the router. At least 36 in. (91.44 cm) is required both in front of and behind the router.
Clearance Requirements for MX2010 Routers with Standard Cable Managers
The clearance requirements for the MX2010 with standard cable managers differ depending on whether
the MX2010 is using AC or DC power.
show the dimensions
and clearance requirements for AC- and DC-powered MX2010 routers with standard cable managers.
147
Summary of Contents for MX2010
Page 1: ...MX2010 Universal Routing Platform Hardware Guide Published 2019 12 03...
Page 28: ......
Page 30: ...MX2010 Power System Description 95 MX2010 Cooling System Description 45 4...
Page 144: ...MX2010 DC Power 48 V System Electrical Specifications 201 122...
Page 146: ......
Page 233: ......
Page 273: ...Figure 98 Loading the MX2010 Router into the Rack g007436 256...
Page 294: ...Figure 113 Reinstalling an AC Power Distribution Module g007440 D 277...
Page 295: ...Figure 114 Reinstalling a DC Power Distribution Module 48 V D g007432 278...
Page 373: ...4 PART Installing and Replacing Components Installing Components 359 Replacing Components 429...
Page 374: ......
Page 620: ......
Page 715: ...6 PART Troubleshooting Hardware Troubleshooting Components 703...
Page 716: ......
Page 744: ......
Page 772: ......
Page 775: ...763...
Page 783: ...772...
Page 796: ...Jewelry Removal Warning 787...
Page 799: ...Operating Temperature Warning 790...
Page 808: ...DC Power Disconnection Warning 799...
Page 812: ...DC Power Wiring Sequence Warning 803...