ASSEMBLY
Step 2: Assembling the Vertical Leg Tubes
•
Connect all six Vertical Leg Tubes (5, 10) to the V-shaped Tubes (6) and secure with Long Nuts (7),
Washers (8) and Bolts (9).
•
Fasten the Long Nuts (7) with Allen Key (26) and make sure all connections are tight.
7
10
6
5
8
9
26
7
Step 3: Assembling the Top Rail Frame
•
Connect Top Rail Tubes (a) (19) to the T-shaped Joints (4). First slide the bigger end of the Top Rail
Tube (a) (19) into the T-shaped Joint (4). Then slide the smaller end of another Top Rail Tube (a) into
the joint. Make sure the smaller end is tightly connected to the bigger end and T-shaped Joint.
•
Repeat this step to connect the other set of the Top Rail Tubes (a) (19) and T-shaped Joint (4).
•
Slide the smaller end of the Top Rail Tube (b) (20) into the bigger end of the Top Rail Tube (c) (21) to
connect Top Rail Tubes (b) and (c).
•
Connect all the assembled sections by sliding the smaller ends of each section into the bigger ends of
each next section to complete the Top Rail Frame.
Note:
When connecting the Top Rail Tubes (a) (19) to the T-shaped Joints (4), be sure that
the opening on each T-shaped Joint is facing the inner side of the Top Rail Frame.
19
20
4
21
Step 4: Assembling the Leg Tubes to the Top Rail Tubes
•
Connect the assembled Leg Tubes to the assembled Top Rail Frame.
•
Make sure that the locking tabs on the Vertical Leg Tubes (5, 10) go through the openings on the
T-shaped Joints (4) and connection tabs of the Top Rail Tubes (b) and (c).
5
10
Locking
tab