3 Mounting and removal
9
3.1
Mounting location
3.2
Close mounting
3.3
Electrical isolation
a
Preferably vibration-free, so that screw terminals cannot work loose!
a
Free from aggressive media, such as strong acids and caustic solutions and preferably free from dust and powder or
other suspended matter, so that ventilation slots cannot get blocked up!
a
Maintain at least 10 cm of space at the top,
so that the release slot can be accessed with a screwdriver from above.
a
Several instruments can be mounted right next to one another, without a gap.
(1) Measurement input
(2) Relay output
(3) Binary input
(4) Binary output
(5) Setup interface
(6) LC Display
(7) Supply
Summary of Contents for safetyM TB/TW
Page 19: ...5 Commissioning the instrument 17 2011 12 31...
Page 42: ...9 DIN approved probes 2011 12 31 40...
Page 50: ...13 What if 2011 12 31 48...
Page 51: ......