
5 Startup of the device
26
5
Startup of the device
5.1
Display and control elements
h
When the voltage supply is set up, a testing routine starts during which all LEDs blink and the backlight display shows white
pixels for 2 s and black pixels for 2 s.
After the testing routine is complete the device displays the measured value (default setting).
v
If an alarm or error message appears, refer to Chapter 12 "Alarmmeldungen".
5.2
Setting the display after device is switched on
v
The main measured value appears on the screen in German (default setting). The example shows the screen layout of a con-
troller with direct switching behavior at a setpoint value of 34 °C and limit value monitoring of 50 °C.
If the measured value is within the hysteresis at "Power ON", the relay outputs controller K1 and
limit value K2 are set to inactive.
(1) Control direction of the controller
(2) Alarm function
(3) Digital input
(7) Measured value
(6) Limit value
(4) Unit
(5) Setpoint value
Summary of Contents for exTHERM-DR
Page 2: ...Operating overview...
Page 3: ......
Page 9: ...Content...
Page 16: ...3 Mounting 16 3 Mounting 3 1 Dimensions...
Page 42: ...7 ATEX ignition protection type e and t 42 7 2 1 Probe arrangement in the Ex area...
Page 63: ...9 Configuration level 63...
Page 86: ...15 Behavior of Outputs 86 15 Behavior of Outputs...
Page 89: ...16 Certificates 89 16 Certificates Examination certificate...
Page 90: ...16 Certificates 90...
Page 91: ...16 Certificates 91...
Page 92: ...16 Certificates 92...
Page 94: ...16 Certificates 94 IECEx...
Page 95: ...16 Certificates 95...
Page 96: ...16 Certificates 96...
Page 97: ...16 Certificates 97 Ex e and t...
Page 98: ...16 Certificates 98...
Page 99: ...16 Certificates 99...