
– 5 –
3-3. Adjusting the height of the knee lifter
) The standard heght of the presser foot lfted usng the knee lfter s 2 mm.
2) You can adjust the presser foot lft up to 3 mm usng knee lfter adjust screw
1
.
Do not operate the sewing machine in the state that the presser foot
3
is lifted by
12 mm or more since the needle bar
2
comes in contact with the presser foot
3
.
WARNING :
Turn OFF the power before starting the work so as to prevent accidents caused by abrupt start of
the sewing machine.
1
2
3
3-4. Installation of thread stand
Assemble the thread stand, set t up on the machne table usng the nstallaton hole n the table and
tghten nut
1
gently. When you use power suppled by the overhead power lne, pass the power supply
cord through hollow spool rest rod
2
.
1
3-5. Caution when installing the panel
Use washers, toothed lock washers, and screws
1
mounted on the machne head when nstallng
the panel.
The screws attached to the panel
may damage the screw holes since
the pitch of the screws is different
from that of the machine head.
1
2