JUDO QUICKSOFT-UNO
31
Service Record Sheet
11.
Service Record Sheet
Date installed:
System pressure:
Date:
Raw water hard-
ness measured
[°e]:
Set [°e]:
Mixed water hard-
ness measured
[°e]:
Water meter [m³]:
Number reg.
1)
S
L
N
K
Intake time
2)
[minutes] (approx.
3 minutes)
Wastewater pro-
duced [litres]
(approx. 3.5 litres)
Rinse
3)
(3 - 4,5 litres)
Initial filtrate
4)
(2,5 - 4 litres)
1) Is completed by the customer service department (S = Total sum, L= extended salting pe-
riod, N= normal regeneration, K = reduced salting period)
2) Position 2
3) Position 3
4) Position 5
The values for intake time, wastewater produced, rinsing and initial filtrate apply to each re-
generation stage.