background image

20

JUDO QUICKSOFT-DUO

Maintenance

7.

Maintenance

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

Always observe the chapter on “Intended
Use”!

7.1

Cleaning

ATTENTION

(see chapter “Safety information and
dangers due to non-compliance”)

Only use clear, clean drinking water to
clean the housing.

Domestic all-purpose cleaners and glass
cleaners can contain up to 25% solvents or
alcohol (spirits).

These substances can chemically attack the
plastic parts, which can lead to brittleness or
even fractures.

Such cleaners must therefore not be
used.

8.

Warranty and Services

In order to comply with the legal warranty
claim, according to DIN 1988, Part 8, it is
necessary that the owner/user "carry out an
inspection at least every 2 months." De-
pending on the water volume consumed, the
corresponding salt consumption must be
regularly monitored. If necessary refill the
regenerating salt (only use quality according
to DIN EN 973). Hygienic care is required
when refilling salt. For example, the salt
packages should be cleaned before use so
that contaminations cannot get into the salt
solution container. The regenerating salt
must be tipped directly from the opened
package into the salt solution container.

Ensure that the salt solution container is not
overfilled and that it is carefully closed again
at the end of the work. Part packages are to
be avoided. The salt may only be stored in
clean and dry rooms. A service is to be car-
ried out by a qualified, skilled service firm of
the manufacturer …"at least"… annually,
half-yearly in jointly used installations …".

Regular servicing is indispensable in order
to continue to achieve a successful process
for many years after the unit is put into ser-
vice. In the building services sector this is
covered by DIN 1988, Part 8.

A servicing agreement is the best way to en-
sure a good operating function beyond the
warranty period. 

Wherever possible, the regular servicing
work and supply with consumables and
wearing materials, etc. should be carried out
by the specialist trade or the factory’s cus-
tomer service department.

The service-label fixed to the device
should be marked by the plumber after
the mounting of the device and indicates
the date of the service that will take place
next.

Abb. 11: Service label

Summary of Contents for QUICKSOFT-DUO

Page 1: ...nstructions and safety information before installing and putting the unit into service These must always be issued to the owner user Installation and Operating Instructions JUDO QUICKSOFT DUO Softener...

Page 2: ...holder JUDO Wasseraufbereitung GmbH 71364 Winnenden Germany All rights reserved Reprints even of extracts is only permitted with special approval Dear Customer thank you for the confidence you have sh...

Page 3: ...JUDO QUICKSOFT DUO 3...

Page 4: ...able at the place in which the softener is used This instruction manual is intended to make it easier to familiarize yourself with the softener and its possible intended uses The instruction manual co...

Page 5: ...nd dangers due to non compliance In detail failure to observe the general danger symbols can result for example in the following risks failure of important functions of the softener danger to persons...

Page 6: ...ing the instruction manual The manufacturer supplier must always be consulted before using the softener outside the use limitations given in the instruction manual The softeners are only to be used in...

Page 7: ...2 Notes on special dangers 2 2 1 Electrical equipment installations Electrical devices equipment which are not splash proof and which are located near the softener can be damaged by water which escap...

Page 8: ...t on the drinking water quality 4 Installation 4 1 General ATTENTION see chapter Safety information and dangers due to non compliance The unit may only be installed by skilled personnel The chapter on...

Page 9: ...i tion 5 Failure to observe this can impair its function 4 1 3 Power supply ATTENTION see chapter Safety information and dangers due to non compliance The mains voltage may not be interrupted e g by l...

Page 10: ...bly cover of the built in rotary flange The connection flange of the softener is covered by a white protective disc This pro tective disc is fastened with four cylinder head screws M6x25 Loosen all fo...

Page 11: ...lushing the water pipe take off the assembly cover of the built in rotary flange Connect the bypass valve on the flange side with the cast in letter R pipe flange to the built in rotary flange by enga...

Page 12: ...e wall support so far that it rests against the softener casing and the softener hangs vertically to the wall 4 1 9 Wastewater connection and back up overflow hose The hoses for the regeneration waste...

Page 13: ...ng the raw water hardness Open the water inlet Open the bypass valve ATTENTION For safety reasons the softener must be vented immediately after it is connected to the water system bypass valve is open...

Page 14: ...he DIP switch 21 contacts 1 to 4 see Fig 9 To make an adjustment the allocated contact of the DIP switch is moved to the position opposite to ON For raw water hardnesses less than 10 e all the DIP swi...

Page 15: ...er depending on the raw water hardness and the mixed water hardness set In accordance with the current drinking water regulations the limit value for sodium in drinking water is 200 mg l This does not...

Page 16: ...thetic resin spheres on which the calcium ions which make the water hard are exchanged for sodium ions This makes the water soft However the ion exchange resin only absorbs a limited quantity of hardn...

Page 17: ...ter the regenerating salt shortage occurs 5 4 Modifications changes spare parts ATTENTION see chapter Safety information and dangers due to non compliance Only original spare parts are to be used Inde...

Page 18: ...icantly differ from the setpoint values see chapter Service Record Sheet the customer service department must be notified Always quote the unit number 28 which is imprinted in the top of the unit conn...

Page 19: ...ly see chapter Commissioning Late salt refill During regeneration the driving wheel was manually turned The drive turns the driving wheel until the normal operating position is reached again Then the...

Page 20: ...d before use so that contaminations cannot get into the salt solution container The regenerating salt must be tipped directly from the opened package into the salt solution container Ensure that the s...

Page 21: ...he maximum operating pressure is lower in order to ensure the optimum function of the softener For further information please refer to the Diagrams chapter Operating pressure Nominal pressure 2 7 bar...

Page 22: ...hardness of 10 e depending on the volumetric flow rate Fig 12 Pressure loss in normal operating position Max possible quantity drawn off daily depending on the raw water hardness and a mixed water ha...

Page 23: ...ty related to 1 m of mixed water with 10 e depending on the raw water hardness Fig 15 Wastewater quantity Salt consumption rela ted to 1 m of mixed water with 10 e depending on the raw water hardness...

Page 24: ...per pipes can be laid Our recommendation Install a JUDO JULIA metering pump in the mixed water pipe downstream of the softener in order to proportionately enrich the water with a JUL mineral solution...

Page 25: ...JUDO QUICKSOFT DUO 25 JQS D Spare Parts 10 JQS D Spare Parts 1 3 148 9 6 88 7 2 26 4 5 80 106 17 16 15 12 13 14 20 21 25 11 18 112 28 23 10 36...

Page 26: ...26 JUDO QUICKSOFT DUO JQS D Spare Parts...

Page 27: ...JUDO QUICKSOFT DUO 27 JQS D Spare Parts...

Page 28: ...flow rate display yellow 13 Net display green 14 Switch over display yellow 15 Regeneration right display green 16 Trouble display red 17 Regeneration left display green 18 Manual pushbutton to trigg...

Page 29: ...2 5 1 1200130 1 61 Clamping union nut 3 1140011 5 70 Control disc wheel 1 1120382 12 71 Cylinder head screw M5x35 5 1650215 2 73 Cylinder head screw M5x10 1 1621116 2 74 Expanding spring 2 1650186 2 7...

Page 30: ...113 Tool cover 1 2200444 30 114 O ring 43x3 1 1200187 2 115 Impeller with magnet 1 2201258 33 116 O ring 13x2 5 1 1200236 1 141 Solenoid valve cable 1 2200714 31 142 Electrode cable 1 2200716 21 148...

Page 31: ...ke time2 minutes approx 3 minutes Wastewater produced litres approx 3 5 litres Rinse3 3 4 5 litres Initial filtrate4 2 5 4 litres 1 Is completed by the customer service department S Total sum L extend...

Page 32: ...Brussel Bruxelles Tel T l 32 0 24 60 12 88 Fax 32 0 24 61 18 85 e mail info benelux judo eu www judo eu JUDO France S r L 76 Rue de la Plaine des Bouchers Technosud F 67100 Strasbourg Tel 33 0 3 88 6...