JUDO QUICKSOFT-DUO
17
Operation
5.3
Salt fill
As the softener functions automatically, you
only have to refill it with regeneration salt
from time to time.
At the latest when the "Top up salt" sticker
becomes visible in the salt container.
The salt stocks should not be allowed to
reduce so much that the liquid level is above
the regenerating salt, otherwise it rises
excessively when the salt is refilled. The
liquid level should be 10 - 12 cm above the
floor of the container.
If the container is not refilled in good time the
solid regenerating salt displaces the brine.
An unnecessarily large amount of brine is
drawn up during the next regeneration, the
intake procedure takes a correspondingly
longer time.
Our recommendation:
Broxo or Solvay
salt, either as a block, tablets or coarse
grains 7 - 15 mm.
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
If there is no more regenerating salt in the
container or if it is not refilled in good time,
the softener switches to economy operation:
The brine stocks still available are primarily
used for disinfecting the ion exchange resin
and the softening effect is reduced.
In this way, the softener remains in a hygien-
ically safe condition for weeks after the
regenerating salt shortage occurs.
5.4
Modifications / changes /
spare parts
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
Only original spare parts are to be used!
Independent modifications and changes are
prohibited for safety reasons! These can
impair the function of the softener. The test
marks imprinted on the unit are only valid if
original spare parts are used.
5.4.1 Servicing / Repair
The unit must be serviced at least once a
year in accordance with the requirements of
DIN 1988. A half-yearly service is required
for jointly used systems.
We recommend you conclude a servicing
agreement.
Check the functions:
–
Remove the cover (
2
).
–
As long as regeneration is taking place
either the control lamp (
17
) or (
15
) is lit.
As soon as the regeneration is
completed trigger
regeneration by
pressing on the regeneration trigger
button (
18
).
–
The driving piston turns the driving
wheel (
23
), which in turn controls the
small gear wheel. Each stroke of the
driving piston is accompanied by the
lighting up of the LED (
14
). The position
of the driving wheel can be read off at the
position display (
11
). After two strokes
the salting position (Pos. 2) is reached.
After approx. 3 minutes the drive
executes a stroke again. Wastewater
quantity up until then approx. 3.5 litres.
–
After this stroke the "Backwash" position
(Pos. 3) is reached. The resin is flushed
from below upwards. Duration 100
seconds, wastewater 3 – 4.5 litres.