18
JUDO QUICKSOFT-DUO
Operation
–
Then two strokes are performed again,
until the "Initial filtrate" position (Pos. 5)
is reached. Here the resin is flushed
from above downwards. Duration 100
seconds, wastewater 2.5 - 4 litres.
–
After two further strokes the first stage
regeneration is completed. Total dura-
tion max. 9 minutes. The driving wheel
now turns the right gear wheel with two
strokes for the second stage regenera-
tion up until the salting position (Pos. 2).
After approx. 3 minutes the drive
executes a stroke again. Wastewater
quantity up until then approx. 3.5 litres.
–
After this stroke the "Backwash" position
(Pos. 3) is reached. The resin is flushed
from below upwards, duration 100
seconds, wastewater 3 - 4.5 litres.
–
Then two strokes are performed again,
until the "Initial filtrate" position (Pos. 5)
is reached. The resin is flushed from
above downwards, duration 100 seconds,
wastewater 2.5 - 4 litres.
–
After a further two strokes the operating
position (Pos. 1) is reached again and the
regeneration is completed, total duration
max. 15 minutes.
–
If the measured values significantly differ
from the setpoint values (see chapter
“Service Record Sheet”), the customer
service department must be notified.
Always quote the unit number (
28
),
which is imprinted in the top of the unit
connection flange.
Before carrying out any work on the
softener, which extends beyond pure opera-
tional control, the softener must be depres-
surised! Failure to observe this can lead to
an uncontrolled escape of water and there-
fore lead to water damage in the building.
Strictly comply with the instructions given in
the “Installation” and “Maintenance” chap-
ters.
5.5
Stoppages
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
The water supply to the softener is inter-
rupted. The main tap is closed or the bypass
valve is switched over.
The softener must be stored in a dry, frost-
free place when dismantled. The connecting
flange must be protected against dirt and
damage.
If the softener is refitted and put back into
service, regeneration must always be
carried out first (see chapter “Commis-
sioning”).
Disconnect the power pack from
the socket! (If installed, disconnect
the power pack of the downstream
metering pump too!)
Disconnect the power pack from
the socket! (If installed, disconnect
the power pack of the downstream
metering pump too!)