![JST CMK-R Operation Manual Download Page 5](http://html1.mh-extra.com/html/jst/cmk-r/cmk-r_operation-manual_2028783005.webp)
JST
CMK-R INDUSTRY STANDARD APPLICATOR
H:\0 - Quality Documents\2 Department\Tech Serv\Application tooling\Applicators and Die sets\TS142-01
CMK-R Manual.doc
5
2. SHEAR BLADE
2-1 ASSEMBLING THE SHEAR BLADE
Place spacer (149) onto the rear of the ram, making sure that the chamfered edge is
facing in, and the etched part number is facing out. Place shear blade (150) into
position and secure with 2 x M4 hexagon screws.
Note: Make sure that the M4 screws holding the blade and spacer DO NOT protrude
through to the front of the ram, This will result in the punches not being able to
float freely, and almost certainly cause punch damage.
3. TERMINAL STRIPPER
3.1 PURPOSE
After the terminal has been successfully crimped on the wire, the terminal may
adhere to the punches, the stripper assumes the role of removing the terminal from
the punches.
3.2 ASSEMBLY
Firstly, attach the stripper (155) to the stripper bracket (142) using 2 x M4 screws,
next attach the bracket (142) to the slot on the side of the main casting using 1 x M6
screw. The stripper is usually positioned between the Conductor punch and the
Insulation punch, ensuring there is no contact with either part.
Depending on the kind of terminal, the stripper may be fitted to the rear of the
conductor punch.
(107) Ram
(149) Spacer
(150) Shear
blade
(142) Stripper
Bracket
(155) Stripper
Conductor punch
Insulation punch